• STREET LIGHT CONSTRUCTION NOTICE <br /> 1 <br /> AGENCY: EWER DRAWING <br /> EWER MAP E-20K <br /> ~ DATE: May 24, 2006 <br /> City of Eugene-PWM (Maintenance) t C <br /> City of Eugene-PWE (Capital& PEPI) _X ~i\`Q/ <br /> Please provide power and connect 2 of 200 watt HPS street lights <br /> These lans are outlined below and shown on the attached drawing: <br /> P <br /> EWER CONSTRUCTION PLANS <br /> 26 Ave and Hilyard St. -Project 4258 - 26 Ave &Hilyard St. <br /> Developer's Name: Cherry City Electric Eugene Water & Electric Board <br /> Telephone #:503-399-7609 <br /> COE Rep's Name: Randal Dale Prepared By: Lisa Jeffryes <br /> Telephone 682-4961 Telephone 682-6231 <br /> PO Good Job # 4258 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> 2'`$6.00=$12.00 <br /> <br /> ~r+ 1. Connect 2-200 watt high pressure sodium street lights as per attached drawing and bill $12/month <br /> as per EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill City of Eugene for the following <br /> work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: (1 " $47) + $50 $ 97.00 <br /> Total: $ 97.00 <br /> Agency: Cit f ene Eugene W & Elect ' Board <br /> Authorized by: ~ By: <br /> 8-15-03 <br /> Q:IPROJECTS\PROJ-814258\Correspondencel0ther\4258-20060524 StreetLightConstNtc.doc <br /> r <br /> 7 <br /> <br />