New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4256 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4256 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:19:39 AM
Creation date
6/20/2008 2:35:34 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004256
GL_Project_Number
955105
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00010
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 10/11 /2005 ~ 2006-10 <br /> PROJECT NAME JOB NO. <br /> 2005 COMM. WW. EXTENSION PROJECT MONROE,WASHINGTON, &PATTERSON ST. 4256 <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> H&J CONSTRUCTION <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> KEITH JURASEVICH 541-682-5247 9/28/2005 <br /> FIRST NOTIFICATION <br /> L - <br /> 10/11/2006 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Ins or Signature <br /> SECOND NOTIFICATION <br /> 6PECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 11/18!2005 0 11/17/2005 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMfTTED BY: 12h/2005 ~ <br /> ~ (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> <br /> ~r Ins Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 12/1/2005 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> kSLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> RV ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT ~t1 AND #2, ALL WORK IS GUARANTEED <br /> 8Y THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> bNE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRA <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE EPA <br /> Inspecto Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> bISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-644256 05 Comm WW Ext\Correspondence\Contractors\First Second Third Notification.doc APR/ 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.