22. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties. • : • : • : • : • <br /> CITY OF EUGENE CONTRACTOR _ . • <br /> <br /> ~By: ~ By: ~~~i~rr~aa/ P <br /> (signature) (signature) <br /> Dennis M. Taylor Thomas E. Burg <br /> C~ City Manager President <br /> Date: ~ ~ C'b Date: 7" 12 <br /> ~U <br /> ~v <br /> v2• <br /> ~3~~ ~ ~ <br /> Y_---,,.---_._-- <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 6 <br /> (Revised February 2004) <br /> <br />