~ . <br /> ~ <br /> 6 Walk thru with forestry <br /> 40 Plan initiation <br /> ~r 24 Plan redlines <br /> 32 30% review and correspondence <br /> $16,920 <br /> Tech 6 Site visit <br /> 40 Prelim design studies <br /> 6 Walk thru with forestry <br /> 16 Plan initiation <br /> 96 Plan prep <br /> 32 Plan revision <br /> $13, 720 <br /> Other/Team Leader $2,500 <br /> Total 30% Design $33,140 <br /> Total Engineering through 30% Design $108,330 <br /> With FS $151,662 <br /> <br /> ~w <br /> <br />