1 <br /> <br /> Ci <br /> Run Date: 08/09/2006 11:27:37 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: WILDISH CONSTRUCTION CO. <br /> Job p: 93-004264 Original Contract: $1,016,487.00 <br /> Contract No: 2006-00029 Current Amount: $1,017,212.00 <br /> PO 2006100466 Contract Award Date: 06/15/2006 <br /> Assessable: No Completion Date: 09/11/2006 <br /> Line Deacrintion Last Chng Ord Current Contract Estimated Pa <br /> Unit Price Unit Measure Quantity yment Cumulative Totals & Complete <br /> Amount Quantity Amount Quantity <br /> 43RD i DONALD STORMWATHR SYSTHM CAPACITY UPORADH Amount <br /> General <br /> 0000 Liquidated Damages <br /> ($530.00) DAY 0.000 $0.00 0.000 <br /> 0010 MOBILIZATION $0.00 0.000 $0.00 0.00 <br /> $100,000.00 LUMPSUM 1.000 $100,000.00 1.000 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $100,000.00 1.000 $100,000.00 100.00 <br /> $20,000.00 LUMPSUM 1.000 $20,000.00 0.520 <br /> 0030 FLAGGERS $10,400.00 0.520 $10,400.00 52.00 <br /> $41.00 HOUR 800.000 $32,800.00 273.500 <br /> 0040 SPECIAL SIGNS $11,213.50 273.500 <br /> $11,213.50 34.00 <br /> $365.00 EACH 15.000 $5,975.00 3.000 <br /> 0050 EROSION CONTROL $1,095.00 3.000 $1,095.00 20.00 <br /> $3,200.00 LUMPSUM 1.000 $3,200.00 <br /> 0060 SURFACING STABILIZATION 0.520 $1,664.00 0.520 $1,664.00 <br /> $41.00 CUYD 52.00 <br /> 710.000 $29,110.00 0.000 <br /> 0070 PAVEMENT REMOVAL $0.00 0.000 $0.00 0.00 <br /> $2.00 SQFT 5,625.000 $11,250.00 0.000 <br /> 0080 REMOVE AND REINSTALL GUARD RAZ $0.00 0.000 $0.00 0.00 <br /> $2,200.00 LUMPSUM 1.000 $2,200.00 1.000 <br /> 0090 4 INCH / 6 INCH PVC WW PIPE $2,200.00 1.000 $2,200.00 100.00 <br /> $70.00 FOOT 80.000 $5,600.00 44.000 <br /> 0100 8 INCH PVC liW pIPS $3,080.00 44.000 $3,080.00 55.00 <br /> $78.00 FOOT 16.000 $1,248.00 28.000 <br /> 0110 10-12 INCH PVC SD PIPE S2,184.00 26.000 $2,184.00 175.00 <br /> $98.00 FOOT 61.000 $5,978.00 25.000 <br /> 0120 36 INCH CLASS IV CONCRETE SD P $2,450.00 25.000 $2,450.00 41.00 <br /> $140.00 FOOT 3,735.000 $522,900.00 1,010.000 <br /> 0130 PIPE TEES, 10-12 INCH $141,400.00 1,010.000 <br /> $141,400.00 M 27.00 <br /> $214.00 EACH 6.000 $1,284.00 4.000 <br /> 0140 TV PIPE INSPECTION $856.00 4.000 <br /> $856.00 67.00 <br /> $1.00 FOOT 3,812.000 $3,812.00 885.000 <br /> 0150 CATCH BASIN TRAP $885.00 885.000 <br /> $885.00 23.00 <br /> $230.00 EACH 13.000 $2,990.00 0.000 <br /> 0160 CONCRETE MANHOLES, SD (D=72") $0.00 0.000 $0.00 0.00 <br /> $5,300.00 EACH 16.000 $84,800.00 4.000 <br /> 0170 CONCRETE MANHOLES, SD (D=96") $21,200.00 4.000 $21,200.00 25.00 <br /> $8,000.00 EACH 2.000 $16,000.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br />