~Rur, l~aty 04/10/2007 11:07:03
<br /> City of Eugene Page 2
<br /> ~ Contract Preliminary Progress Payment
<br /> Payment No 008
<br /> Contractor: WILDISH CONSTRUCTION CO.
<br /> Job p: 93-004264 Original Contract: $1,016,487.00
<br /> Contract No: 2006-00029 Current Amount: $1,040,869.19
<br /> PO 2006100466 Contract Award Date: 06/15/2006
<br /> Assessable: No Completion Date: 09/11/2006
<br /> Line Description La
<br /> st_ Chn~Ord Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 43RD 6 DONALD STORMWATHR SYSTHM CAPACITY UPORADH
<br /> General
<br /> 0000 Liquidated Damages ($530.00) DAY 0.000
<br /> $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0010 MOBILIZATION $100,000.00 LUMPSUM 1.000
<br /> $100,000.00 0.000 $0.00 1.000 $100,000.00 100.00
<br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $20,000.00 LUMPSUM 1.000
<br /> $20,000.00 0.000 $0.00 1.000 $20,000.00 100.00
<br /> 0030 PLAGGHRS $41.00 HOUR 800.000
<br /> $32,800.00 0.000 $0.00 1,005.500 $41,225.50 126.00
<br /> 0040 SPECIAL SIGNS $365.00 EACH 15.000
<br /> $5,475.00 0.000 $0.00 9.000 $3,285.00 60.00
<br /> 0050 EROSION CONTROL $3,200.00 LUMPSUM 1.000
<br /> $3,200.00 0.000 $0.00 1.000 $3,200.00 100.00
<br /> 0060 SURFACING STABILIZATION $41.00 CUYD 710.000
<br /> $29,110.00 0.000 $0.00 779.800 $31,971.80 110.00
<br /> 0070 PAVEMENT REMOVAL $2.00 SQFT 5,625.000
<br /> $11,250.00 0.000 $0.00 7,791.500 $15,583.00 139.00
<br /> 0080 REMOVE AND REINSTALL GUARD RAZ $2,200.00 LUMPSUM
<br /> 1.000 $2,200.00 0.000 $0.00 1.000 $2,200.00 100.00
<br /> 0090 4 INCH / 6 INCH PVC WW PIPE $70.00 FOOT 80.000
<br /> $5,600.00 0.000 $0.00 83.000 $5,810.00 104.00
<br /> 0100 8 INCH PVC WW PIPH $78.00 POOT 16.000
<br /> $1,248.00 0.000 $0.00 33.000 $2,574.00 206.00
<br /> 0110 10-12 INCH PVC SD PIPE $98.00 FOOT 61.000
<br /> $5,978.00 0.000 $0.00 88.500 $8,673.00 145.00
<br /> 0120 36 INCH CLASS IV CONCRETE SD p $140.00 FOOT 3,735.000
<br /> $522,900.00 0.000 $0.00 3,737.000 $523,180.00 M 100.00
<br /> 0130 PIPS THH3, 10-12 INCH $214.00 BACH 6.000
<br /> $1,284.00 0.000 $0.00 9.000 $1,926.00 150.00
<br /> 0140 TV PIPE INSPECTION $1.00 FOOT 3,812.000
<br /> $3,812.00 0.000 $0.00 4,655.400 $4,655.40 122.00
<br /> 0150 CATCH BASIN TRAP $230.00 EACH 13.000
<br /> $2,990.00 0.000 $0.00 13.000 $2,990.00 100.00
<br /> 0160 CONCRETE MANHOLES, SD (D=72") $5,300.00 EACH 16.000 $84,800.00 0.000
<br /> $0.00 14.000 $74,200.00 88.00
<br /> 0170 CONCRETE MANHOLES, SD (D=96") $8,000.00 EACH 2.000 $16,000.00 0.000
<br /> $0.00 1.000 $8,000.00 50.00
<br /> 0180 CONCRETE MANHOLES, SD SUMP (D= $5,300.00 EACH 2.000 $10,600.00 0.000
<br /> $0.00 2.000 $10,600.00 100.00
<br /> 0190 CONCRSTB MANHOLH3, SD CI CARRY $5,500.00 EACH 2.000 $11,000.00 0.000
<br /> 50.00 3.000 $16,500.00 150.00
<br />
<br /> 0200 CONCRETE SADDLE $380.00 EACH 5.000
<br /> $1,900.00 0.000 $0.00 2.000 $760.00 40.00
<br />
<br /> 0210 LEVHL 2, 1/2• DHNSH, HMAC $77.00 TON 70.000 $5,390.00 0.000
<br /> $0.00 125.890 $9,693.53 180.00
<br />
<br />
|