<br /> . ,~X~•~ b,i~ <br /> EXHIBIT C <br /> Public Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eugene, Oregon 97401 <br /> (541)682-5560 <br /> (541) 682-8410 FAX <br /> Men~.orandum <br /> Date: December 22, 2004 <br /> To: FII,E <br /> From: Matt Rodrigues, Civil Engineer I <br /> Sabject: Scope of Work For Cleaning and TV Inspection Services for 43`~ and Donald <br /> Capacity Improvement Project. <br /> The scope of work includes TV inspection of the 54"+ storm line from the intersection of Donald <br /> and 46~' to the outfall near West Amazon and Fox Hollow. The length of this storm segment is <br /> approximately 4300'. The basic path of the line originates at Donald and 46~' ,runs north along <br /> east side of Donald until the intersection at 43'x, then runs east along the south side of 43'~ until <br /> the intersection with Fox Hollow, the line then runs along the north side of Fox Hollow thru an <br /> easement before the outfall into the Amazon Channel. <br /> Also included is the cleaning of the line, if needed, at the rates identified in the quotation. Visual <br /> inspection indicates that the line should be relatively clean. <br /> <br />