Run Date: 02/~'~2006 11:18:23 <br /> /!~1' City ^sugene <br /> Engine t Estimate <br /> Estimate: 4264-43rd and Donald; Stogy Upgrade v <br /> ,1 <br /> Job 93-004264 43RD & DONALD STORMWATSR SYSTEM CAPACITY UPGRADE <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 43RD & DONALD STORMWATER SY3TSM CAPACITY UPGRADE <br /> General <br /> 0010. MOBILIZATION 1.00 LUMP SUM $50,000.00 $50,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMP SUM $5,000.00 $5,000.00 <br /> 0030. EROSION CONTROL 1.00 LUMP SUM $3,500.00 $3,500.00 <br /> 0040. REMOVAL OF MANHOLES 0.00 EACH $500.00 $0.00 <br /> OQ50. REMOVE AND REINSTALL GUARD RAIL 1.00 EACH $700.00 $700.00 <br /> 0060. 4 INCH / 6 INCH PVC PIPE (SANITARY SERVICE) 88.00 FOOT $25.00 $2,200.00 <br /> 0070. 8 INCH PVC PIPE (SANITARY) 8.00 FOOT $25.00 $200.00 <br /> 0080. 10 INCH PVC PIPE (STORM) 55.00 FOOT $40.00 $2,200.00 <br /> 0090. 36 INCH CLASS IV CONCRETE PIPE (STORM) 3,735.00 FOOT $102.00 $380,970.00 <br /> 0100. PIPE TEES, 10 INCH 4.00 EACH $350.00 $1,400.00 <br /> 0110. TV PIPE INSPECTION 3,735.00 FOOT $1.00 $3,735.00 <br /> 0120. CONCRETE MANHOLE, STORM DRAIN 19.00 EACH $3,500.00 $66,500.00 <br /> 0130. CONCRETE SUMP MANHOLE, STORM DRAIN 1.00 EACH $4,000.00 $4,000.00 <br /> 0140. CONCRETE MANHOLE SD/C.I. CARRY THROUGH 1.00 EACH $4,000.00 $4,000.00 <br /> 0160. CONCRETE MH OVER EXIST 54" SD 96" 2.00 EACH $8,000.00 $16,000.00 <br /> 0180. OUTFACE 0.00 LUMPSUM $30,000.00 $0.00 <br /> 0200. CONCRETE SADDLE 2.00 EACH $750.00 $1,500.00 <br /> 0210. CONCRETE CURB AND GUTTER 70.00 FOOT $50.00 $3,500.00 <br /> 0220. CONCRETE WALKS 100.00 SQFT $10.00 $1,000.00 <br /> 0230. FABRIC, GEOTEXTILE 1,070.00 SQYD $1.50 $1,605.00 <br /> 0240. CATCH BASIN CUT IN 1.00 EACH $500.00 $500.00 <br /> 0250. SPECIAL INFORMATIION SIGNS 6.00 EACH $300.00 $1,800.00 <br /> Total General $550,310.00 <br /> Total 43RD & DONALD STORMWATSR SYSTEM CAPACITY UPGRADE $550,310.00 <br /> 43RD & DONALD STORMWATSR SY3TSM CAPACITY UPGRADE - Other / Direct <br /> General <br /> 0010. Contingency 10?c of Contract $55,031.00 <br /> 0020. test 2~ of Contract $11,006.20 <br /> 0030. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0040. Printing 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> OQ50. Consultants 1.00 LUMPSUM $6,000.00 $6,000.00 <br /> Total General $73,737.20 <br /> Total 43RD & DONALD STORMWATSR SYSTEM CAPACITY UPGRADE - Other / Direct $73,737.20 <br /> 43RD & DONALD STORMWATER SYSTEM CAPACITY UPGRADE - Miscellaneous <br /> General <br /> 0010. Engineering Charge 23~ of Direct $143,530.86 <br /> Total General $143,530.86 <br /> Total 43RD & DONALD STORMWATSR SYSTEM CAPACITY UPGRADE - Miscellaneous $143,530.86 <br /> <br /> Total 4264-43rd and Donald; Storm Upgrade $767,578.06 <br /> <br />