Maintenance Requirements <br /> Facility Type Annual Maintenance AcBvlties <br /> <br /> ~yr 48" CSP (2-5 ft. cover) N/A <br /> 66" CSP (2-5 ft. cover) N/A <br /> 72" CSP (2-5 fl. cover) N/A <br /> CSWMP Objectives and Policies Addressed by the Capital Project <br /> Flood Control <br /> • This capital project is expected to eliminate the predicted surface flooding problems for the 10-year design storm <br /> under existing and future land use condftions Identified in pipe segments AMUP060A, 60C, 130A and the culvert at <br /> Willamette St. <br /> Water Quslity <br /> N/A <br /> Natural Resources <br /> N/A <br /> Other City Objectives Addressed by the Capital Project <br /> o be completed by the City <br /> Costs Construction Costs: $1,796,300 <br /> Site Acquisition: $0 <br /> Engineering /Administration: $359,200 <br /> Capital Project implementation Costs ;2,155,500 <br /> Annual Maintenance Costs SO <br /> <br />