New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4294 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4294 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:07:05 PM
Creation date
6/20/2008 9:55:00 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004294
GL_Project_Number
955112
Identification_Number
Begin Warranty
COE_Contract_Number
2005-00026
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Notification of Commencement and <br /> Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 5/18/2005 2005-26 <br /> PROJECT NAME JOB NO. <br /> Delta Ponds North Parking Lot 4294 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Delta Construction Co. NA <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Mike Dunawa /John Casto 541 682- 8819 Ma 18, 2005 <br /> FIRST NOTIFICATION <br /> May 18, 2005 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 6/30105 0 6/30/2005 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 7/15/2005 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> August 26,2005 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND it <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS ~ <br /> REQUIRED UNDER THE CONTRACT. IT IS AGREED THAT THE CONTRACTOR WILL RETURN WHEN DIRECTED BY THE CITY ENGINEER TO DO <br /> THE SEEDING AS WELL AS THE FIRST AND SECOND WEED CONTROL. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR I <br /> WARRANTY PERIOD. ~ <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> I REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> ~ THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> !i WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEA?~ V1 ARF}ANTY PE IflDyVILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. % j <br /> s <br /> ~I , ,f . <br /> inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> I <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-4\4294\Correspondence\Contractors\4294 Third Not. 20050831.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.