New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4294 CO1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4294 CO1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:07:05 PM
Creation date
6/20/2008 9:54:08 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004294
GL_Project_Number
955112
Identification_Number
2005100448
COE_Contract_Number
2005-00026
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F~ , <br /> ~ CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # a2sa <br /> Contract # 2005-26 <br /> CONTRACTOR Delta Constriction Co. Change Order # 1 <br /> (ADDRESS) 999 Divisbn Avenue Date: 07/19/05 <br /> Eugene, OR 97404 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: Delta Ponds North Parking Lot Inspector. J. Casto <br /> Proj. Mgr. J. Ramirez <br /> Principal Eng. M. Cahill <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 71 Additional removal of NW Natural Gas excavated abandoned i line <br /> 81 Additional removal of NW Natural Gas excavated trench s it material <br /> 451 Additional lumbi work to connect water fountain <br /> 461 Additional work on Portable Restroom Sheller <br /> Ori anal contract com lotion date was June 25 2005 revised contract com lotion date is June 30 2005. <br /> Thanges the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Untt Amended Net <br /> No. Item Chan a Units Cost Amount Chan a Chan e <br /> Ori anal 1.00 LS 2 500.00 2500.00 $216.20 <br /> Revised 1.00 LS 2 716.20 2 716.20 <br /> 71 Ptemoval of Structures and Obstructions Amended 0.00 0.00 0.00 0.00 <br /> Ori anal 1.00 LS 3 576.00 3 576.00 $691.75 <br /> Revised 1.00 LS 267.75 267.75 <br /> 82 gearin and Grubbin Amended 0.00 0.00 0.00 0.00 <br /> Ori anal 1.00 LS 00.00 0.00 $73.00 <br /> Revised 1.00 LS 873.00 873.00 <br /> 451 Drtnkin Fountain Base w sum Amended 0.00 0.00 $0.00 $0.00 <br /> Ori anal 1.00 LS 9 290.00 9 290.00 $595.35 <br /> Revised 1.00 LS 9885.35 9 885.35 <br /> 461 Portable Reslroom Shelter Amended 0.00 $0.00 0.00 $0.00 <br /> Ori anal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 .00 0.00 <br /> Ori anal 0.00 0.00 .00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> The original contract work days are o.o da s <br /> The contract time change this C.O 5.o da s <br /> The contract time change by previous C.O: s o.o da s n'n~ <br /> The new contract work da s are 5.o da ~(JJU l1 <br /> ~rlginal contract sum was $302.842.63 <br /> ange by previous change order $0.00 <br /> Net change due to amendment by previous change order $0.00 <br /> The contract sum prior to this change order was s3o2sa2s3 <br /> This dFtange order will change contract sum by this amount $1,576.30 <br /> <br /> The new mntr~et ne4 eh~nne m ~m <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.