p <br /> ~.d~Y~-w~`-~ 1 ~p4~ <br /> 2v ~ ~ q 33 ~ ~ ~ 1 ~ Z-- <br /> Accounts Receivable Worksheet <br /> <br /> ~ PuDllc Works Maintenance: Tra111c Operations siuin For: Delta Ponds Parkin Lot GJN 4294 Date: <br /> 1820 Roosevelt Blvd, Eugene, OR 97402 Send to En ineerin 05/25/04 <br /> /s41/ eel-4aoo Responsible Party: Joe Ramirez <br /> Location: Goodpasture Is Rd & Delta ponds parking lot <br /> DVSW: <br /> LABOR:.. <br /> Hourly Benefit Base Total Overhead Employee <br /> Employee Rate + Rate = Rate x Ho X 17.58% = Charge <br /> Re resented Em to ees: <br /> Ed Lee $19. $6.04 $25.92 2 1.1759 $51.84 <br /> Charles Lane Tem em to ee $13.86 6.04 $19. 3 1.1759 $59.70 <br /> Alex Johnson Tem em to ee $12.22 $ .26 3 1.1759 $54.78 <br /> Re . Em to ees OT: <br /> Exem t Em to ees: <br /> Exem t Em to ees OT: <br /> LABOR TOTAL: $16 . 2 <br /> EQUIPMENT: <br /> i Hourly Total Equipment <br /> Equipment Type Rate x Hours = Charge <br /> 3oao57 6.85 3.00 20.55 <br /> 3otoas 8.00 2.00 16.00 <br /> EQUIPMENT TOTAL: 36.55 <br /> MATERIALS: <br /> Actual Number of Overhead Material <br /> Material Type Cost x Units + 70% = Charge <br /> 4"x4"xt2'treatedwood ost $12.08 1 $1.21 $13.29 <br /> 10' e" steel u-Chanel osts $20.00 3 $6.00 $66.00 <br /> 24"x30" aluminum si n blanks $8.35 2 $1.67 $18.37 <br /> 30" aluminum stop sign blank $9.45 1 $0.95 $10.40 INVE)ICE TOTAL': <br /> 18"x30" aluminum sign blank $5.80 1 $0.58 $6.38 Labor . <br /> 30" stop sign face $7.15 1 $0.72 $7.87 Charges .32 <br /> 24"x 30" keep right symbol sign face $5.15 2 $1.03 $11.33 Equipment <br /> 18"x 30" Hadicap sign face $4.75 1 $0.48 $5.23 Char es $36.55 ` r <br /> Material l~ 7, <br /> Char es $138.85 <br /> MATERIAL TOTAL: $138.85 ~ TOTAL: $3 2 <br /> a~~ <br /> <br />