New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4293 GeoDesign Contract 2005-00231
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4293 GeoDesign Contract 2005-00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:06:11 PM
Creation date
6/19/2008 3:49:09 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004293
GL_Project_Number
955584
Identification_Number
20061000021
COE_Contract_Number
2005-00231
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Eugene-8-02 Proposal Cost Breakdown Supplemerrtal Sheet <br /> <br /> ~ Cumu/adve <br /> f2uantlty Units Rate Subtotals Total <br /> River Ave from approximately 100 feet east of RNer Road <br /> OS to approximatey 362 feet east of River Rd 262 feet Cores 1 <br /> On Slte FWD testing and Coring FWD 10 <br /> FWD Unit (includes staff engineer) 0.25 each ; 1,500.00 ; 375.00 <br /> Shaff Engineer III (core logging) 2.0 hours S 100.00 ; 200.00 <br /> Flagging Subcontractor (irx:ludes 12% markup) 0.25 each ; 675.00 ; 168.75 <br /> Drilling Subcontractor (includes 12% markup) 0.5 each S 1,000.00 ; 500.00 <br /> Data Reduction and Anatysis <br /> Project Engineer 5.0 hours ; 110.00 ; 550.00 <br /> Laboratory Testing <br /> Moisture Content 2.0 each ; 12.00 ; 24.00 <br /> Wash Sieve Analysis 0.0 each ; 80.00 E - <br /> Atterberg Limits 0.0 each ; 105.00 S - <br /> Report Preparation <br /> Principal Engineer (review) 1.0 hour ; 145.00 ; 145.00 <br /> Protect Engineer 6.0 hours ; 110.00 ; <br /> 3.0 hours S 81.00 S 243.00 <br /> Project Assistant 2.0 hours ; 70.00 S 140.00 <br /> Support Staff 1.0 hours ; 54.00 ; 54.00 <br /> Subtotal ; 3,059.75 ; 47,583.15 <br /> Additional Charyea for Travel and Mileage N individwl trips required for Eaeh Road Section <br /> Per D(em (without ovemighU 8.5 each ; 20.00 ; 170.00 <br /> per Diem (with hotel) 4.5 each ; (100.00) ; (450.00) <br /> Travel Tlne (additional) 17.5 hours ; 93.00 ; 1,627.50 <br /> Mileage (additional) 1950 m(les ; 0.48 ; 936.00 <br /> Subtotal ; 2,283.50 ; 49,t1ti6.85 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.