7` <br /> Euaene-6-01 Proposal Cost Breakdown Supplemental Sheet <br /> ' Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 06 Mdcinleyfrom5"'to11"' 2,359 feet Cores 5 <br /> On Slte FWD testing and Corirg FWD 47 <br /> FWD Unit (irxludes staff engineer) 0.4 each S 1,500.00 S 600.00 <br /> <br /> > Staff Engineer III (core logging) 6.5 hours i 100.00 S 650.00 <br /> Flagging Subcontractor (ndudes 1294 markup) 1.1 each S 675.00 S 742.50 <br /> Drilling Subcontractor (indudes 12% markup) 0.6 each Z 1.000.00 S 600.00 <br /> Data Reduction and Analysts <br /> Project En9i~ 10.0 haws Z 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Mdsture Content 7.0 each S 12.00 S 84.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Repot Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 10.0 hours Z 110.00 S 1,100.00 <br /> Drafting 5.0 hours = 81.00 S 405.00 <br /> Project Assistant 3.0 hours S 70.00 t 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 6,055.00 = 51,835.90 <br /> Additional Charges for Travel and Mileage H individual trips required for Each Road Sactton <br /> Per Diem (without ovemigM) 8.5 each 3 20.00 S 170.00 <br /> per Diem (with hotel) 4.5 each S (100.00) i (450.00) <br /> Travel Tkne (additional) 17.5 hours S 93.00 S 1,827.50 <br /> Mileage (additional) 1950 m'les S 0.48 S 936.00 <br /> Subtotal S 2,283.50 f 54,119.40 <br /> ClT~(~clr:N~ eN~~.m.,... <br /> <br />