New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4293 GeoDesign Contract 2005-00230
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4293 GeoDesign Contract 2005-00230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:06:10 PM
Creation date
6/19/2008 3:41:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004293
GL_Project_Number
955584
Identification_Number
2006100018
COE_Contract_Number
2005-00230
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit L <br /> Eusrene-6.01 Proposal Cost Breakdown Supplerrrental Sheet <br /> Cumuladre <br /> t?uandty Units Rate Subtotals Total <br /> Pro)ect Mana0ement <br /> Project Engineer 12 hours ; 110.00 ; 1,320.00 <br /> Mileage 100 miles ; 0.48 ; 48.00 <br /> Per Diem 0.5 days S 100.00 S 50.00 <br /> 1,418.00 S 1,418.00 <br /> Initial Distress Survey for All Roads <br /> Project Engineer 15 hours ; 110.00 ; 1,650.00 <br /> Mileage 200 miles ; 0.48 ; 96.00 <br /> <br /> ' ; 1,746.00 ; 3,164.00 <br /> All FWD Testing Completed YYith Single MobllizaUon <br /> Staff Engineer 111 6 hours ; 100.00 ; 600.00 <br /> Mileage 180 rrd~les ; 0.48 ; 86.40 <br /> Per Diem 3 days ; 100.00 ; 300.00 <br /> 986.40 S 4,150.40 <br /> All Coring Completed With Two Mobflizatlons <br /> Staff Engineer III 12 haul S 97.00 ; 1,164.00 <br /> Mileage 250 miles ; 0.48 = 120.00 <br /> Per Diem 6 days ; 100.00 ; 800.00 <br /> ; 1,884.00 ; 6,034.40 <br /> 01 Oaknant Way from Sorrel Way to Oakway Road 2,205 feet Cores 4 <br /> On Site FYVD testing and Coring FWD 44 <br /> FWD Unit (indud~ staff engineer) 0.5 each ; 1,500.00 ; 750,00 <br /> Staff Engineer NI (core logging) 5.0 haws ; 100.00 ; 500.00 <br /> Flagging S~coMractor (indudes 1296 markup) 1.2 each ; 675.00 S 810.00 <br /> DriNing Subcontractor (includes 1296 markup) 0.6 each ; 1,000.00 ; 600.00 <br /> Data Reductlar and Analysis <br /> Project Engineer 9.0 hours S 110.00 S 990.00 <br /> Laboratory Tasbrrg <br /> Moisture Cartent 7.0 each ; 12.00 ; 84.00 <br /> wash sieve Anaysis 2.0 each ; 80.00 ; 160.00 <br /> Atterfrerg LMdts 1.o each s 105.00 ; 105.00 <br /> Report Pnsparafion <br /> Prindpal Engineer (review) 1.5 hour ; 145.00 ; 217.50 <br /> Project Engineer 10.0 hears ; 110.00 ; 1,100.00 <br /> Drafting ~ 5.0 hours ; 81.00 ; 405.00 <br /> Project Assistant 3.0 fears ; 70.00 ; 210.00 <br /> Support Staff 1.5 hours ; 54.00 ; 81.00 <br /> Subtotal S 6,056.50 ; 12,090.90 <br /> 02 West Amazon Drive from Hilyard to Fox Hdlow 3,856 feet Cores 8 <br /> On Site FWD testing and Cortng FWD 77 <br /> FWD Unit {includes staff engineer) 0.6 each ; 1,500.00 ; 900.00 <br /> Staff Engineer Ili {core logging) 10.0 trours ; 100.00 ; 1,000.00 <br /> Flagging Sutxxxrtrar~or (includes 1296 markup) 1.5 each ; 675.00 ; 1,012.50 <br /> DrNiing Sutxxrnttactor (includes 1296 markup) 1.0 each ; 1,000.00 ; 1,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 11.0 hours ; 110.00 ; 1,210.00 <br /> Laboratory Testing <br /> Moisture Content 8.0 each S 12.00 ; 96.00 <br /> Wash Steve Analysis 2.0 each ; 80.00 ; 160.00 <br /> Atterberg Lkrtts 1.0 each S 105.00 ; 105.00 <br /> Report Preparation <br /> PrinGpal Engineer (review) 2.0 hour S 145.00 ; 290.00 <br /> Project Engineer 11.0 hours ; 110.00 ; 1.210.00 <br /> Drafting 5.o Hours ; s1.oo ; 405.00 <br /> Project Assistant 3.0 fours S 70.00 ; 210.90 <br /> Support Staff 2.0 hours S 54.00 ; 108.00 <br /> Subtotal S 7,706.50 t 19.797.40 <br /> ~..1. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.