New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4293 GeoDesign Contract 2005-00230
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4293 GeoDesign Contract 2005-00230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:06:10 PM
Creation date
6/19/2008 3:41:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004293
GL_Project_Number
955584
Identification_Number
2006100018
COE_Contract_Number
2005-00230
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PERSONAL SERVICES CONTRACT <br /> Architect and Engineer <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation <br /> AND: GeoDesign, Inc. <br /> Contract No.: 2005-00230 <br /> This contract is being established per the terms and conditions of Personal Services <br /> Master Contract master contract 2004-00228 dated February 17, 2004, between the <br /> City of Eugene (City) and GeoDesign, Inc. (Contractor). <br /> City and Contractor mutually agree to the attached scope of work as outlined herein and <br /> the contract referenced above as follows: <br /> City of Eugene PPP 2007 Various Sites: Provide pavement testing and design <br /> services, as described in the proposal, for Group 1, which includes the following <br /> streets: <br /> OAKMONT WAY FROM SORREL WAY TO OAKWAY ROAD <br /> WEST AMAZON DRIVE FROM HILYARD TO FOX HOLLOW <br /> AGATE FROM 28-FEET SOUTH OF 13TH CURB RETURN TO 22ND <br /> 18TH AVE FROM 510-FEET EAST OF CHAMBERS INTERSECTION TO BAILEY <br /> HILL RD <br /> GARFIELD FROM 6T" TO 13T" <br /> MCKINLEY FROM 5T" TO 11T" <br /> This project is not to exceed $51,835.90. and the completion date is September <br /> 30,2006. <br /> For Clarification, see Scope of Work attached. <br /> All other terms and conditions of master contract #2004-00228 apply to this scope of <br /> work and remain in full force and effect. <br /> CITY OF EUGENE CONT CTOR <br /> <br /> ~V/ Ku Corey, P.E. Geor a sunders, P.E. <br /> Public Works Di ctor Principal Geotechnical Engineer <br /> Date: w ' Z ~ ~ ~ Date:_ ~,NUt,. 2.tx~G, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.