New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4293 GeoDesign Contract 2005-00230
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4293 GeoDesign Contract 2005-00230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:06:10 PM
Creation date
6/19/2008 3:41:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004293
GL_Project_Number
955584
Identification_Number
2006100018
COE_Contract_Number
2005-00230
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ^r ~DESIGNZ <br /> August 1, 2005 <br /> . City of Eugene, Public Works Engineering Division <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> Attention: Mr. Matt Rodrigues <br /> Proposal Addendum <br /> City of Eugene PPP 2007 <br /> Chambers Street, West 24~' Avenue to West 28"'Avenue <br /> Eugene, Oregon <br /> GeoDesign Project: Eugene-6-03 <br /> INTRODUCTION <br /> GeoDesign, Inc. is pleased to submit this proposal addendum for pavement engineering services <br /> for the City of Eugene, Oregon. The purpose of the addendum is to include Chambers Street <br /> from West 24"' Avenue to West 28"' Avenue to the City of Eugene PPP 2007 list of projects. The <br /> section of Chambers Street is approximately 2,400 feet long and 45 feet wide. The services to be <br /> provided include pavement rehabilitation analysis consisting of falling weight deflectometer <br /> (FWD) testing, subsurface explorations, and equivalent single-axle load (ESAL) calculations. <br /> SCOPE OF WORK <br /> We propose to complete shallow cores and FWD testing to evaluate the existing pavement <br /> conditions. Our specific scope of services will include the following: <br /> • Complete a distress survey of the existing pavement, including logging the extent of cracking <br /> and rutting. <br /> • Explore subsurface conditions in the road right-of--way by completing up to five cores to <br /> depths of up to 5 feet below the ground surface. <br /> • Maintain a detailed log of the explorations and obtain samples of the pavement, base, and <br /> subgrade materials encountered. <br /> • Obtain soil samples at select depths in the soil borings. <br /> 15571 NY tMnnia D4wi. G~ire 1 AA I OnnlanA !1R 07~~4 I IM COi Q6A A7R7 1 Fav SOR.gfiR.30fiA <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.