New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4292
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 11:36:12 AM
Creation date
6/19/2008 3:06:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
004292
GL_Project_Number
955146
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SYSTEMS DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br /> Project Name: A3 Channel Subbasin; Water Quality Facilities <br /> <br /> - Project Manager Name: Matt Rodrigues <br /> Service ID # (e.g. Good Job Number 004181): 429? Contract # (e.g. 2004-0505): Capital Project # (o.y. 905244): <br /> SDC Expenditure Requirements <br /> Improvement Fees: May be spent only on capital improvements included in an adopted Capital Improvement Plan that increase capacity needed to <br /> provide service for future users, Including those that provide new facilities or Increase the capacity provided by existing facilities. <br /> Wastewater Eligible: Non-assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br /> the project. (Quantify portions ofproject that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br /> Stormwater Ellglble: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br /> the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent o(project that will serve new <br /> development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent o/project serving existing <br /> development. Subtract from 100% to derive the percentage of project that will serve new development.] <br /> _ <br /> _ <br /> _ <br /> Transportation Eligible: Non-assessable components attributable to future development of 1) arterial and collector street projects and related tratffc signals, and <br /> 2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br /> basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br /> attributed to new development between year of construction and build out]. <br /> Parks Eligible: Components o(Neighborhood or Community park projects attributable to future development. (Quantify portions of project that are capacity <br /> enhancing versus those portions needed to serve existing users. Pro-rate design/construction management costs on a propo~lionate basis.] <br /> Reimbursement Fees: May be spent only on capital improvements Included In an adopted Capital Improvement Plan, including those for new <br /> facilities and rehabllitstlon of exlatin facilities. <br /> Wastewater Ellglble: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> - - - <br /> - - _ _ <br /> Transportation Ellglble: Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and maintenance of the existing system <br /> (Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed bylaw). No transportation reimbursement SDC <br /> revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br /> Parks Eligible: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br /> Allocation Costs & Percentages of Total Project Costs <br /> Project Initiation Phase Bid Phase Final Phase <br /> Wastewater bnprove. Fee $ ~ /o $ % $ o~ <br /> I <br /> A oved Amounts, if different $ I <br /> Wastewater Reimburse. Fee $ % $ % $ % <br /> Approved Amounts, if different: $ % $ % $ o~ <br /> Stormwater Improve. Fee $?_Q000 'I 100% $ % $ % <br /> Approvrd Amounts, if dlfterent $ % $ $ % <br /> Stormwater Reimburse. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> Transportation Improve. Fee $ $ ~U $ <br /> $ I <br /> Approved Amounts, if different $ ~ % $ ° % <br /> Transportation Reimburse. Fee $ % $ % $ <br /> o $ <br /> Approved Amounts, if different: $ % $ % <br /> Parks Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ $ % $ % <br /> Parks Reimburse. Fee $ NIA % $ NIA % $ NIA 9'0 <br /> Approved Amounts, if different: $ % $ % $ <br /> Expenditure Allocation Justipcation <br /> Attach documentation that demonstrates justification of SDC funding of this capital project at project Initiation phase as well as at time of any <br /> subsequent revisions of SDC allocation amounts/percentages. <br /> State law requires an annual accounting of SDC expenditures by system at the project level. An SDC expenditure may be legally challenged for up to <br /> two years after the expenditure. <br /> 'S,. <br /> Approved fay: _ _ _ _ _ _ - <br /> Date: Date: Date: <br /> p:\DARWINS\Rodrigues\ProjectsW3_Channel_WQ\4292-20041018-SDC_Allocation.xls Revised March, 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.