New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4299 PBS 01.10.06
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4299 PBS 01.10.06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2008 10:08:36 AM
Creation date
6/19/2008 1:48:39 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
Yes
External_View
No
GJN
004299
GL_Project_Number
926106
Identification_Number
Revised
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CIP Estimate Terry Colvin <br /> Royal Node Storm Water Infrastructure 11/04 <br /> ITEM Acreage Cost per UNIT TOTAL <br /> Acquisition Notes <br /> Drainage cooridor (Existing channel) 5.5 $15,000.00 <br /> Drainage cooridor (outside channel) 8,5 $82,500.00 <br /> Acquisition Admin /Engineering LUMPSUM $80,000.00 $680,000.00 <br /> $40,000.00 $40,000.00 Boundry work, Acquistion, Wetland Deliniation <br /> Design and Construction <br /> Riparian enhancement (Acres) 11 $85,000.00 $935,000.00 Includes permitting, engineering, construction, plantin <br /> Wetland Enhancement (Acres) 3 $50,000.00 g <br /> $150,000.00 <br /> Total $1,887,500.00 <br /> Values <br /> "S.Family/Wetland Acquisition ACRES <br /> "Commercial Acquistion $80,000.00 <br /> <br /> ' Previously Effected areas (channel/road) ACRES $220,000.00 <br /> Wetland Mitigation $15,000.00 <br /> ACRES $50,000 <br /> Estimate reflects accepted delineation to date, as refered to in **RASP, acreage may increase due to new guidelines for method of deliniation. A ratio of 1:1 is <br /> used for mitigation due to degraded site conditions. This could be higher which would decrease the cost of acquisition and increase the cost of project <br /> mitigation. This Estimate only includes open channel work within the Royal Node plan from Terry to Greenhill Tributary and a small tributary to the south. It <br /> does NOT include roadside swales, other open space adjacent to the drainage cooridor or off site mitigation requirements neccessary for development or <br /> mitigation for other infrastructure. The Royal Node wetland mitigation plans appears to be in phases and should be addressed with a good understandin of <br /> the established Ian. g <br /> See RASP P. 62- 66 Wetlands and P. 68-72 Storm Water Draina e <br /> 'Cost reflect mitigation cost reduction <br /> **RASP= Royal Ave. Specific Plan Jan. 2003 <br /> Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.