icon uaLe: 11/04/4 09:22:42 <br /> City of Eugene <br /> Estimate ribution <br /> Estimate: gjn est <br /> Job 93-004296 AIRPORT 2005 REHAB BAGGAGE ARgA, NORTH RAMP <br /> Line No. Description ~ ~ <br /> Quantity Unit Unit Price Amount <br /> AIRPORT 2005 REHAB BAGGAG$ AREA, NORTH RAMP i <br /> General <br /> 0010. MOBILIZATION <br /> 0040. EROSION CONTROL 1.00 LUMPSUM $80,000.00 $80,000.00 <br /> 0050. Airport Safety & Security 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> 0060. EXCAVATION, UNCLASSIFIED 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> 0070. EXCAVATION, OVER 1,000.00 CUYD $20.00 $20,000.00 <br /> 0080. CR 16" DEPTH 50.00 CUYD $40.00 $2,000.00 <br /> 0090. AC, VARIOUS DEPTHS 15,000.00 SQYD $11.50 $172,500.00 <br /> 0100. Cold Plane Removal 4,000.00 TON $42.00 $168,000.00 <br /> 0110. Pavement Markings 20,000.00 SQYD $3.00 $60,000.00 <br /> 0120. Adjust lights 6,000.00 SQFT $1.00 $6,000.00 <br /> 0130. recessed markers 5.00 EACH $480.00 $2,400.00 <br /> Total General 25.00 EACH $300.00 $7,500.00 <br /> Total AIRPORT 2005 RLHAB BAGGAGE AREA, NORTH RAMP $530,400.00 <br /> $530,400.00 <br /> AIRPORT 2005 REHAB BAGGAGg AREA, NORTH RAMP - Other / Direct <br /> General <br /> 0010. Advertising <br /> 0020. Administration 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> 0030. test 1.00 LUMPSUM $3,000.00 $3,000.00 <br /> Total General 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> Total AIRPORT 2005 REHAB BAGGAGE AREA, NORTH RAMP - Other / Direct $9,000.00 <br /> $9,000.00 <br /> AIRPORT 2005 REHAB BAGGAGE AREA, NORTH RAMP - Miscellaneous <br /> General <br /> OOYO. Engineering Charge <br /> Total General 1.00 LUMPSUM $80,600.00 $80,600.00 <br /> Total AIRPORT 2005 REHAB BAGGAGE AREA, NORTH RAMP - Miscellaneous $80,600.00 <br /> $80,600.00 <br /> <br /> Total gjn est <br /> $620,000.00 <br /> <br />