<br /> Billable Project Costs As Of 07/31 /2005 <br /> <br /> 08/26/200 12:02:19 PM Page 4 of 71 <br /> <br /> Project Billed Acti- Total Amount Billed <br /> Billed ~ vi TranDate TranId Resource Employed uanti $Amount OperOvhd AdmOvhd Transaction Remark <br /> <br /> 0410 Bertelsen Rd (4295) $479.82 $578.45 $1,058.27 <br /> 3636213 Materials Testine $479.82 $578.45 $1,058.27 <br /> 286C Asphaltic concrete ryuulity control (CE) $479.82 8578.45 51,058.27 <br /> 07/28/2001 f13560146 Engineering Technician 2 2 L-H $69.36 $100 60 ac testine <br /> 07/28/2005 t73S60146 PASSENGER VANS 2 H $13.00 ac testing <br /> 07/28/2001 f13S60156 Engineering Technician 2 4 L-H $138 72 $20120 ac testing <br /> 07/28!2001 fl3160156 PASSENGER VANS 4 H $24.00 ac testing <br /> 07/29/2005 (13560147 Engineering Technician 2 6 L-H $138.73 $201.20 ac testing <br /> 07/29/2005 t13560147 PASSENGER VANS 6 H $36 00 ac testing <br /> 07/29/2005 f135601 S7 Engineering Technician 2 1.5 L-H $52.02 $75.45 ac testing <br /> 07/29/2005 ft3560157 PASSENGER VANS 1.5 H $9 00 ac testing <br /> ~ <br /> <br />