Run Date: 08/10/2005 11:36:44 <br /> Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $374,047.98 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals i Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0160 CONCRETE PUMPING $0.13 SQFT 4,946.000 $642.98 0.000 $0.00 0.000 $0.00 0.00 <br /> 0170 SAWCUTTINO $2.64 LINPT 292.000 $770.88 0.000 $0.00 959.000 $1,211.76 157.00 <br /> 0180 5 INCH CONC SURFACING $4.20 SQPT 202.000 $848.40 471.000 $1,978.20 471.000 $1,978.20 233.00 <br /> 0190 4 INCH CONC WALK $9.65 SQFT 22.000 $212.30 0.000 $0.00 25.000 $241.25 114.00 <br /> 0200 TOP8OZL $6.77 BQFT 114.000 $771.78 226.000 $1,530.02 236.000 $1,530.02 198.00 <br /> 0210 TI8 BARS $6.00 MACH 5.000 $30.00 0.000 $0.00 30.000 $180.00 600.00 <br /> 0220 CURB INLETS, TYPE 1 1/2A $559.00 EACH 1.000 $559.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br /> Alley #13 <br /> 0221 RELOC 10" STM DRAIN PIPE-#15 & 001 $1,868.96 LUMPSUM 1.000 $1,868.96 1.000 $1,868.96 1.000 $1,868.96 100.00 <br /> 0230 MOBILIZATION $5,436.22 LUMPSUM 1.000 $5,436.22 1.000 $5 436.22 1.000 $5 436.22 100 00 <br /> 0240 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSUM 1.000 $1,975.00 1.000 $1,975.00 1.000 $1,975.00 100.00 <br /> 0250 TRHS PROTHCTION FBNCINO $5.17 LZNFT 30.000 $155.10 40.000 $206.80 40.000 $206.80 133.00 <br /> 0260 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 1.000 $303.00 1.000 $303.00 100.00 <br /> 0270 10" DRAIN PIPE $29.91 LINFT 194.000 $5,802.54 194.000 $5,802.54 194.000 $5,802.54 100.00 <br /> 0280 MINOR ADJUSTMENT OF MANHOLES $207.00 EACH 1.000 $207.00 1.000 $207.00 1.000 $207.00 100.00 <br /> 0290 CATCH BASINS $1,154.00 fiACH 5.000 $5,770.00 5.000 $5,770.00 5.000 $5 770.00 100.00 <br /> 0300 O8N8RAL SYCAVATION $22.85 CUYD 180.000 $4,113.00 248.000 $5,666.80 248.000 $5,666.80 138.00 <br /> 0310 SUHGRADE STABILIZATION $16.38 CUYD 92.000 $1,506.96 2.200 $36.04 2.200 $36.04 2.00 <br /> 0320 SUBGRADE GEOTEXTZLE $1.03 SQYD 550.000 $566.50 312.000 $321.36 312.000 $321.36 57.00 <br /> 0330 3/4 ZNCH-0 AGGREGATE BASE SURF $0.88 SQFT 184.000 $161.92 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />