, <br /> <br /> Run Date: 09/09/2005 10:54:13 Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $376,930.47 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0490 SUBGRADE STABILIZATION $16.29 CUYD 93.000 $1,514.97 0.000 $0.00 0.000 $0.00 0.00 <br /> 0500 SUBGRADE GEOTEXTILE $1.03 SQYD 553.000 $569.59 114.000 $117.42 114.000 $117.42 21.00 <br /> 0510 3/4 INCN-0 AGGREGATE BASE SURF 50.59 3QPT 660.000 $389.10 1,066.500 5629.24 1,066.500 5629.24 162.00 <br /> 0520 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 110.000 $1,984.40 13.000 $234.52 13.000 $234.52 12.00 <br /> 0530 LEVEL 2, 1/2 INCN DEN9E NNAC $10.14 9QFT 98.000 S993.72 128.000 S1,497.92 128.000 $1,497.92 131.00 <br /> 0540 PLAIN CONC PVMNT, UNDOWELLED, $5.57 SQFT 4,970.000 $27,682.90 4,839.000 $26,953.23 4,839.000 $26,953.23 97.00 <br /> 0542 CONSTRUCT CONCRETE RAMP-ALLEY 002 $449.11 LUMPSUM 1.000 $449.11 1.000 $449.11 1.000 $449.11 100.00 <br /> 0550 CONCRETE PUMPING $0.15 SQFT 4,970.000 $745.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0560 TOPSOIL $6.77 SQFT 15.000 $101.55 134.500 $897.03 134.500 $897.03 883.00 <br /> 0570 TIE BARS $5.10 EACH 14.000 $71.40 37.000 $188.70 37.000 $188.70 264.00 <br /> 0580 SAW CUTTING $2.64 LINFT 117.000 $308.88 43.000 $113.52 117.000 $308.88 100.00 <br /> Allay N4O <br /> 0590 MOBILIZATION $5,283.49 LUMPSUM 1.000 $5,283.49 0.000 $0.00 1.000 $5,283.49 100.00 <br /> 0600 TEMP PROTECTN/DZRECTN $1 975.00 LUMPSUM 1.000 $1,975.00 0.700 $1,382.50 1.000 $1,975.00 100.00 <br /> 0610 TREE PROTECTION FENCING $5.97 LINFT 15.000 $89.55 0.000 $0.00 0.000 $0.00 0.00 <br /> 0620 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.700 $212.10 1.000 $303.00 100.00 <br /> 0630 10" DRAIN PIPE $28.50 LINFT 183.000 $5,215.50 0.000 $0.00 183.000 $5,215.50 100.00 <br /> 0640 MINOR ADJUSTMENT OF MANHOLES $207.00 EACH 1.000 $207.00 1.000 $207.00 1.000 $207.00 100.00 <br /> 0650 CATCH BASINS $981.00 EACH 5.000 $4,905.00 1.000 $981.00 5.000 $4,905.00 100.00 <br /> 0660 GENERAL EXCAVATION $24.28 CUYD 190.000 $4,613.20 190.000 $4,613.20 190.000 $4,613.20 100.00 <br /> <br />