Run Date: 09/09/2005 10:54:13 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Paymant No : 003 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $376,930.47 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals t Complete <br /> Line Description Laet Chng Ord Unit Price Unit Measure Quantity Amount antit Amount Quantity Amount <br /> 0160 CONCRETfi PUMPING $0.13 SQPT 4,946.000 $642.98 0.000 $0.00 0.000 $0.00 0.00 <br /> 0170 SAWCUTTZNO $2.64 LINFT 292.000 $770.88 0.000 $0.00 459.000 $1,211.76 157.00 <br /> 0180 5 INCH CONC BURFACINO $4.20 BQFT 202.000 $648.40 0.000 $0.00 471.000 $1,978.20 233.00 <br /> 0190 4 INCH CONC WALK $9.65 SQPT 22.000 $212.30 0.000 $0.00 25.000 $241.25 114.00 <br /> 0200 TOPSOIL $6.77 9QFT 114.000 $771.78 0.000 $0.00 226.000 $1,530.02 198.00 <br /> 0210 TIE BARS $6.00 SACH 5.000 $30.00 0.000 $0.00 30.000 S180.00 600.00 <br /> 0220 CURB INLETS, TYPE 1 1/2A $559.00 EACH 1.000 $559.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> Alley #13 <br /> 0221 RELOC 10° STM DRAIN PIPE-#15 & 001 $1,868.96 LUMPSUM 1.000 $1,868.96 0.000 $0.00 1.000 $1,868.96 100.00 <br /> 0230 MOBILIZATION $5,436.22 LUMPSUM 1.000 $5,436.22 0.000 $0.00 1.000 $5,436.22 100.00 <br /> 0240 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSUM 1.000 $1,975.00 0.000 $0.00 1.000 $1,975.00 100.00 <br /> 0250 TREE PROTECTION FHNCING $5.17 LINPT 30.000 $155.10 0.000 $0.00 40.000 $206.80 133.00 <br /> 0260 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 0270 10" DRAIN PIPE $29.91 LINFT 194.000 $5,802.54 24.000 $717.84 218.000 $6,520.38 112.00 <br /> 0280 MINOR ADJUSTMENT OF MANHOLES $207.00 EACH 1.000 $207.00 0.000 $0.00 1.000 $207.00 100.00 <br /> 0290 CATCH BASINS $1,154.00 EACH 5.000 $5,770.00 0.000 $0.00 5.000 $5,770.00 100.00 <br /> 0300 OSNSRAL 88CAVATION $22.85 COYD 180.000 $4,113.00 19.000 $434.15 267.000 $6,100.95 148.00 <br /> 0310 SUBGRADB STABILIZATION $16.38 CUYD 92.000 $1,506.96 0.000 $0.00 2.200 $36.04 2.00 <br /> 0320 SUBGRADE GEOTEXTILE $1.03 SQYD 550.000 $566.50 0.000 $0.00 312.000 $321.36 57.00 <br /> 0330 3/4 INCH-0 AGGREGATE HASE BURP $0.88 3QPT 184.000 $161.92 514.000 $452.32 514.000 $452.32 279.00 <br /> <br />