Run Date: 10/12/2005 14:16:43 <br /> City of Eugene Page 8 <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: 2G CONST. <br /> Job 93-004310 Original Contract: $370,333.81 <br /> Contract No: 2005-00029 Current Amount: $379,730.94 <br /> PO 2005050488 Contract Award Date: 05/23/2005 <br /> Assessable: Yes Completion Date: 10/05/2005 <br /> Line Description Current Contract Hstimated Payment Cumulative Totals 8 Complete <br /> Last Chug Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0990 TEMP PROTECTN/DIRECTN $3,278.00 LUMPSUM 1.000 $3,278.00 0.000 $0.00 1.000 <br /> $3,278.00 100.00 <br /> 1000 TRHH PROTECTION FENCING $5.17 LINFT 25.000 $129.25 25.000 $129.25 25.000 <br /> $129.25 100.00 <br /> 1010 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 <br /> $303.00 100.00 <br /> 1020 10• DRAIN PIPS $31.9! LINFT 34.000 $1,085.96 0.000 $0.00 55.000 <br /> $1,756.70 162.00 <br /> 1030 12" DRAIN PIPS $32.03 LINFT 58.000 $1,857.74 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 1040 THE/STM 10• X 12" $372.00 HACH 1.000 $372.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1050 MINOR ADJUSTMHNT OF MANHOLHS $262.00 EACH 1.000 $262.00 0.000 $0.00 1.000 <br /> $262.00 100.00 <br /> 1060 ADJUST CLEANOUT $152.00 EACH 1.000 $152.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1070 GTCH BASINS $1,035.00 EACH 3.000 $3,105.00 2.000 <br /> $2,070.00 !.000 $!,1!0.00 133.00 <br /> 1080 CONNHCTION TO EXISTING STRUCTU $303.00 EACH 3.000 $909.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1090 GENERAL HXGVATION $23.14 CUYD 151.000 $4,188.34 0.000 <br /> $0.00 181.000 $4,188.34 100.00 <br /> 1100 SUBGRADE STABILIZATION $20.43 CUYD 95.000 $1,940.85 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1110 SUBGRADE GEOTEXTILE $1.03 SQYD 585.000 $602.55 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1120 3/4 INCH-0 AGGREGATE BASE SURP $1.00 SQFT 225.000 $225.00 142.500 <br /> $142.50 142.500 $142.50 63.00 <br /> 1130 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 114.000 $2,056.56 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1140 LEVEL 2, 1/2 INCH DENSE BMAC $5.57 SQFT 684.000 $3,809.88 604.000 <br /> $3,364.28 604.000 $3,364.28 88.00 <br /> 1150 PLAIN CONC pVMNT, UNDOWHLLHD, $5.52 SQFT 5,263.000 $29,051.76 4,879.000 <br /> $26,932.08 4,879.000 $26,932.08 93.00 <br /> 1160 CONCRETH PUMPING $0.14 SQFT 5,581.000 $781.34 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1170 5 INCH CONC SURFACING _$3.09 SQPT 318.000 $982.62 346 000 <br /> $1 069 14 346 000 $1 069 19 109 00 <br /> <br /> 1180 TOPSOIL $6.77 SQPT 79.000 <br /> $53!.83 120.500 $815.79 120.500 $815.79 153.00 <br /> <br />