New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4310 2G PMT 4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4310 2G PMT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:13:43 PM
Creation date
6/19/2008 11:22:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004310
GL_Project_Number
955684
Identification_Number
2005100465
COE_Contract_Number
2005-00029
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 10/12/2005 14:16:43 page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $379,730.94 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Hstimated Payment Cumulative Totals & Complete <br /> Line Description Last Chag Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amovnt <br /> 0160 CONCRETE PUMPING $0.13 SQPT 4,946.000 $642.98 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0170 SANCOTT]IdG $2.64 LINPT 292.000 $770.88 0.000 <br /> $0.00 !59.000 $1,211.76 157.00 <br /> 0180 5 INCH CONC SURFACING $4.20 SQFT 202.000 $848.40 0.000 S0.00 471.000 <br /> $1,978.20 233.00 <br /> 0190 4 INCN CONC WALK $9.65 SQFT 22.000 $212.30 0.000 $0.00 25.000 <br /> $241.25 114.00 <br /> <br /> ' 0200 TOPSOIL $6.77 SQFT 114.000 $771.78 0.000 <br /> $0.00 226.000 $1,530.02 198.00 <br /> 0210 TIH HARE $6.00 EACH S.ODO $30.00 0.000 $0.00 30.000 <br /> $180.00 600.00 <br /> 0220 CURS INLETS, TYPE 1 1/2A $559.00 EACH 1.000 $559.00 0.000 $0.00 0.000 $0.00 0.00 <br /> Alley #13 <br /> 0221 RELOC 10" STM DRAIN PIPE-#15 6 001 $1,868.96 LUMPSUM 1.000 $1,868.96 0.000 $0.00 1.000 $1,868.96 100.00 <br /> 0230 MOBILIZATION $5,436.22 LUMPSUM 1.000 $5,436.22 0.000 $0.00 1.000 $5,936.22 100.00 <br /> 0240 TEMP PROTHCTN/DIRECTN $1,975.00 LUMPSUM 1.000 $1,975.00 0.000 $0.00 1.000 $1,975.00 100.00 <br /> 0250 TRHH PROTHCTION FHNCINO $5:17 LS:NPT 30.000 $155.10 0.000 $0.00 40.000 $206.80 133.00 <br /> 0260 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 0270 10" DRAIN PIPE $29.91 LINFT 194.000 $5,802 .54 0.000 $0.00 218.000 $6,520.38 112.00 <br /> 0280 MINOR ADJUSTMENT OF MANHOLES $207.00 EACH 1.000 $207.00 0.000 $0.00 1.000 $207.00 100.00 <br /> 0290 CATCH BASINS $1,154.00 EACH 5.000 $5,770.00 0.000 $0.00 5.000 $5,770.00 100.00 <br /> 0300 GHNHRAL BECAVATION $22.85 CUYD 180.000 $4,113.00 0.000 $0.00 267.000 $6,100.95 148.00 <br /> 0310 SUBGRADE STABILIZATION $16.38 CUYD 92.000 $1,506.96 0.000 $0.00 2.200 $36.04 2.00 <br /> 0320 SUBGRADE GEOTEXTILE $1.03 SQYD 550.000 $566.50 0.000 $0.00 312.000 $321.36 57.00 <br /> 0330 3/4 INCB-0 AGGABGATH BASB 3UAF $0.88 SQFT 184.000 $161.92 0.000 $0.00 514.000 $452.32 279.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.