Run Date: 11/08/2005 09:58:09 Page 8 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 005 final Pay <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $383,915.47 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Chag Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0970 REMOVE HEDGE $187.00 LUMPSUM 1.000 $187.00 0.000 $0.00 1.000 $187.00 100.00 <br /> Alley #23 <br /> 0980 MOBILIZATION $5,656.99 LUMPSUM 1.000 $5,656.99 0.000 $0.00 1.000 $5,656.99 100.00 <br /> 0990 _ TEMP PROTHCTN/DIRECTN $3 278 00 LUMPSUM 1 000 $3 278 00 0 000 $0 00 1 000 $3 278 00 100 00 <br /> 1000 TREE PROTBCTION PENCING $5.17 LINPT 25.000 $129.25 0.000 $0.00 25.000 $129.25 100.00 <br /> 1010 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 1050 10• DRAIN PIPE $31.94 LIMP! 34.000 $1,085.96 0.000 $0.00 55.000 $1,756.70 162.00 <br /> 1030 12" DRAIN PIPE $32.03 LINPT 58.000 $1,857.74 0.000 $0.00 0.000 $0.00 0.00 <br /> l04o TEE/sTM lo• x lz• $372.00 Each l.ooo $372.00 0.000 $o.oo o.ooo $o.oo o.oo <br /> 1050 MINOR ADJUSTMENT OP MANHOLBS $262.00 EACH 1 000 $262 00 0 000 $0 00 1 000 $262 00 100 00 <br /> 1060 AATUST CLBANOUT $152.00 BACH 1.000 $152.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1070 GTCB BASINS $1,035.00 EACH 3.000 $3,105.00 0.000 $0.00 4.000 $4,140.00 133.00 <br /> 1080 CONNECTION TO HXISTING_STRUCTO $303.00 EACH 3 000 $909 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 1090 GENHRAI, BXCAVATION $23.14 CUYD 181.000 $4,188.34 0.000 $0.00 181.000 $4,188.34 100.00 <br /> 1092 ®{TRA EXCAVATION 005 $1,514.00 LUMPSUM 1.000 $1,514.00 1.000 $1,514.00 1.000 $1,514.00 100.00 <br /> 1094 EXTHND CONDUITS 005 $211.85 LUMPSUM 1.000 $211.85 1.000 $211.85 1.000 $211.85 100.00 <br /> 1096 GRADH ADJUSTMENT 005 $88.72 LUMPSUN 1.000 $88.72 1.000 $88.72 1.000 $88.72 100.00 <br /> 1098 EXTRUDHD CONCRETE CURB 005 $324.00 LUMPSUM 1.000 $324.00 1.000 $324.00 1.000 $324.00 100.00 <br /> <br /> 1100 SUBGRADE STABILIZATION $20.43 CUYD 95.000 $1,940.85 0.000 0.00 0.000_ $0.00 0.00 <br /> <br /> 1110 SUBGRADH GEOTHXTILE $1.03 SQYD 585.000 $602.55 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />