Run Date: 11/08/2005 09:58:09 <br /> City of Eugene Page 30 <br /> Contract Preliminary Progress Paymeat <br /> Payment No 005 pinal Pay <br /> Contractor: 2G CONST. <br /> Job 93-004310 Original Contract: $370,333.81 <br /> Contract No: 2005-00029 Current Amount: $383,915.47 <br /> PO 2005050488 Contract Award Date: 05/23/2005 <br /> Assessable: Yes Completion Date: 10/05/2005 <br /> Liae Description Current Contract Estimated Payment Cumulative Totals t Complete <br /> Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount Qnaat ity Amt <br /> 1310 SUBGRADE GEOTSXTILB $1.03 SQYD 184.000 $189.52 0.000 <br /> $0.00 171.000 $176.13 93.00 <br /> 1320 PLAIN CONC PVMNT, UNDONRr.r.an~ $5.58 SQFT 1,653.000 <br /> $9,223.74 0.000 $0.00 1,539.500 $8,590.41 93.00 <br /> 1322 ALLEY GRADE ADJUSTMENT-ALLEY 2 002 $735.88 LUMPSUM 1.000 <br /> $735.88 0.000 $0.00 1.000 $735.88 100.00 <br /> 1330 CONCRETE PUMPING $0.31 PT 1,768.000 <br /> $548.08 0.000 $0.00 0.000 $0.00 0.00 <br /> 1332 EXTRA CCNCRHTE-ALLEY 29 003 $121.72 LUMPSUM 1.000 <br /> $121.72 0.000 $0.00 1.000 $121.72 100.00 <br /> 1340 1 1/2•-0 AGGRBGAT6 BASS $18.04 CUYD 36.000 <br /> $649.44 0.000 $0.00 46.000 $829.84 128.00 <br /> 1350 5 INCH CONC SURFACING $4.27 S PP 115.000 491.05 0.000 <br /> 0.00 112.000 $478.24 97.00 <br /> 1360 4 INCH CONC WALK $7.78 SQFT 14.000 <br /> $108.92 0.000 $0.00 15.000 $116.70 107.00 <br /> 1370 TOPSOIL $6.77 BQYT 22.000 $148.94 0.000 <br /> $0.00 84.000 $568.68 382.00 <br /> 1380 M= HA68 S14.00 61108 4.000 <br /> $56.00 0.000 $0.00 18.000 $252.00 450.00 <br /> 1390 SAW CUTTING $2.64 LINFT 150.000 <br /> $396.00 0.000 $0.00 32.000 $84.48 21.00 <br /> Alley #32 <br /> 1400 MOBILIZATION $2,500.24 LUMPSUM 1.000 <br /> $2,500.24 0.000 $0.00 1.000 $2,500.24 100.00 <br /> 1410 TBMP pROTECTN DIRECTN 1 975.00 LUMPSUM <br /> 1.000 $1,975.00 0.000 0.00 1.000 $1 975.00 100.00 <br /> 1420 EROSION CONTROL $303.00 LUMPSUM <br /> 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 1430 10" DRAIN PIPE $33.86 LINFT <br /> 28.000 $948.08 0.000 $0.00 28.000 $948.08 100.00 <br /> 1440 ADJUST CLBANOUT 152.00 BACN <br /> 1.000 $152.00 0.000 0.00 1.000 $152.00 100.00 <br /> 1450 MINOR ADJUSTMENT OF MANHOLBS $207.00 EACH <br /> 1460 1.000 $207.00 0.000 <br /> CATCH BASINS $0.00 1.000 $207.00 100.00 <br /> $1,027.00 BACH 2.000 $2,054.00 0.000 $0.00 2.000 2,054.00 100.00 <br /> <br /> 1470 GENERAL EXCAVATION $19.52 CUYD <br /> 100.000 $1,952.00 0.000 <br /> $0.00 100.000 $1,952.00 100.00 <br /> <br />