CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4309 <br /> Contract # 2005-28 <br /> CONTRACTOR: Brown Contracting Inc. Change Order # 1 <br /> (ADDRESS) P.O. Box 26439 Date: 07!15/05 <br /> .Eugene, OR 97402 CAMS Date: <br /> Reviewed b : Date: , <br /> PROJECT: West University Neighborhood Alleys: #4, #9, #14, #24, #26, #27, and #30 at Inspector: M. Koivula ti <br /> 8 various locations in the area generally bounded by Willamette St.,19th Avenue, Construction M r. P. Dickinson <br /> Kincaid Street, and Franklin Boulevard. Proj. Mgr. S. Gallu <br /> Principal Eng. P. Klo e <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 171 Alle #4 -Additional sawcuttin <br /> 341 Alle #9 -Place 4 inch concrete walk on 1" crushed a re ate <br /> 342.. Alle #9 - Sawcut to ad'ust to of new catch basin #81432 <br /> 771 Alle #24 -Tree Removal <br /> 971 Alle #26 -Tree Removal <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Tlme Quantity Unit Amended Net <br /> No. Item Chan a Units) Cost Amount Chan a Change <br /> 171 Alley #4 -Additional Sawcutting Ori final 0.00 1 0.00 0.00 80.00 <br /> 0 Revised 0.00 ; 0.00 0.00 <br /> Amended 1.001 LS 108.00 108.00 $108.00 <br /> 341 Alley #9 - 4 Inch Concrete Walk Ori final 0.00 1 0.00 0.00 $0.00 <br /> 0 Revised 0.00 ; 0.00 0.00 <br /> Amended 13.501 5 FT 8.00 $108.00 $108.00 <br /> 343 Alley #9 -Adjust Top of CB #81432 Ori final 0.00 1 0.00 0.00 $0.00 <br /> 0 Revised 0.00 ; 0.00 0.00 <br /> Amended 1.D01 LS $104.32 $104.32 $104.32 <br /> 771 Alley #24 -Tree Removal Ori final 0.00 1 0.00 0.00 $0.00 <br /> 0 Revised 0.00 ; 0.00 0.00 <br /> Amended 1.001 EA $850.00 $850.00 $850.00 <br /> 971 Alley #26 -Tree Removal Ori final O.DO 1 0.00 0.00 $0.00 <br /> 0 Revised 0.00 ; 0.00 0.00 <br /> Amended 1.D01 EA $850.00 $850.00 $850.00 <br /> Ori final 0.00 1 0.00 0.00 $0.00 <br /> Revised 0.00 ~ 0.00 0.00 <br /> Amended 0.001 $0.00 $0.00 $0.00 <br /> original contract work days are o.o da s ,~i <br /> contract time change this C.O o.o da s h/~ ~n~st Q.aS r a da¢d ~o Co-.f ru.f <br /> contract time change by previous C.O.'s o.o da s ~ S t c Ckwnj ~ <br /> <br /> The new contract work da are o.o da s ~ y <br /> <br /> The original contract sum was <br /> $310.294.00 <br /> Net change by previous change order <br /> Net chap a due to amendment b o.oo <br /> g y previous change order <br /> $o.oo <br /> The contract sum prior to this change order was <br /> $310294.00 <br /> <br /> This`chanae order will channa rnntrarfi si im by this amni..,r e.....,...,.. <br /> <br />