Run Date: 07/08/2005 11:49:53 <br /> City of Eugene Page 8 <br /> Contract Preliminary progress Payment <br /> Payment No : 001 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: <br /> PO 2005050487 Contract Award Date: 05/23/2005310,294.00 <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Line Description Current Contract <br /> Last Chng Ord Unit Price Unit Measure Estimated Payment Cumulative Totals <br /> Quantity Amount Quantity # Complete <br /> Amount Quantity Amount <br /> 1120 CONCRETE PUMPING <br /> $0.20 SQFT 5,283.000 $1,056.60 <br /> 1130 5 INCH CONC SURFACING 0.000 $0.00 0.000 <br /> $9.00 SQFT - $0.00 0.00 <br /> 525.000 $4,725.00 0.000 <br /> 1140 4 INCH CONC WALK $0.00 0.000 <br /> 1150 $8.00 S FT $0.00 <br /> TOPSOIL 45.000 $360.00 0.000 $0.00 0.00 <br /> $5.00 SQPT 0.000 $0.00 <br /> 1160 TIg BARS 156.000 $780.00 0.000 0.00 <br /> $0.00 0.000 $0.00 <br /> $6.00 EACH 9 000 0.00 <br /> 1170 SAW CUTTING $54.00 0.000 $0.00 0.000 <br /> $3.00 LINFT 293.000 $0.00 0.00 <br /> 1180 TRHE, REMOVAL 879.00 0.000 $0.00 0.000 <br /> $850.00 EACH 4.000 0.00 0.00 <br /> Alley ;3p $3,400.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 1190 MOBILIZATION <br /> $3,000.00 LUMPSUM 1.000 $3,000.00 0.500 <br /> 1200 TEMP pROTECTN/DIRSCTN $1,500.00 0.500 $1,500.00 <br /> $2,150.00 LUMPSUM 1.000 50.00 <br /> 1210 EROSION CONTROL $2 150.00 0.300 $645.00 0.300 <br /> $325.00 LUMPSUM $645.00 30.00 <br /> 1.000 $325.00 0.300 <br /> 1220 10• DRAIN PIPE $97.50 0.300 $97.50 <br /> $45.00 LIIibT 53.000 30.00 <br /> 1230 MINOR ADJUSTMBNT OF MANHOLES $2,385.00 50.500 $2,272.50 50.500 $2,272.50 <br /> $500.00 EACH 2.000 95.00 <br /> 1240 CATCH BASINS $1,000.00 0.000 $0.00 0.000 <br /> $1,100.00 EACH $0.00 0.00 <br /> 1250 3.000 $3,300.00 3.000 <br /> CONNECTION TO EXISTING STRUCTU $3,300.00 3.000 $3,300.00 <br /> $500.00 RACH 1.000 100.00 <br /> 1260 GSNERAL EXCAVATION $500.00 1.000 $500.00 <br /> 1.000 $500.00 100.00 <br /> 1270 $39.00 CUYD 175.000 <br /> SUBGRADE STABILIZATION 6,825.00 0.000 $0.00 <br /> 0.000 $0.00 0.00 <br /> $50.00 CUYD 93.000 $4,650.00 0.000 <br /> 1280 SUBGRADE GEOTRXTILE $0.00 0.000 $0.00 <br /> $1.00 SQYD 530.000 0.00 <br /> 1290 3 4 INCH-0 AGGREGATE EASE SURF $530.00 0.000 $0.00 0.000 <br /> $3.00 S FT $0.00 0.00 <br /> 230.000 $690.00 0.000 <br /> <br /> 1300 1 1/2"-0 AGGREGATE EASE $0.00 0.000 0.00 <br /> $20.00 CUYD 90.000 0.00 <br /> $1,800.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> <br />