Run Date: 08/12/2005 08:52:32 <br /> City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $318,228.54 <br /> PO 2005050487 Contract Award Date: 05/23/2005 <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Line Deacrintion Last Cbn Ord Current Contract Estimated Pa <br /> --3__ Unit Price Uait Measure Quantity Amount antit yment Amount Cumulative Totals $ Complete <br /> antit Amount <br /> 0320 CONCRETE PUMPING <br /> $0.20 SQFT 2,064.000 $412.80 0.000 <br /> 0330 3AW CUTTING $0.00 0.000 $0.00 0.00 <br /> $3.00 LINPT 222.000 $666.00 0.000 <br /> 0340 TZE BARS $0.00 367.000 $1,101.00 <br /> $6.00 iACN 9.000 165.00 <br /> <br /> ~'Ikit9p-yli-rV~ S54.00 0.000 $0.00 32.000 5192.00 356.00 <br /> 0341 ALLEY #9 4" CONCRETE WALK 001 <br /> $8.00 SQFT 13.500 $108.00 1.000 <br /> 0343 ALLEY #9 ADJUST TOP OF CB #614 001 $8.00 1.000 $8.00 7.00 <br /> 104.32 LUMPSUM 1.000 $104.32 1.000 <br /> 0344 ALLEY#9 HAND DIG AROUND ROOTS 003 $104.32 1.000 $104.32 100.00 <br /> $829.70 LUMPSUM 1.000 $829.70 1.000 <br /> 0345 ALLEY#9 REM/REPL 4" WW LINE 002 $829.70 1.000 $829.70 100.00 <br /> $1,551.42 LUMPSUM 1.000 <br /> Alley #14 $1,551.42 1.000 $1,551.42 1.000 $1,551.42 100.00 <br /> 0350 MOBILIZATION <br /> $3,000.00 LUMPSUM 1.000 $3 000.00 0.500 <br /> 0360 TEMP PROTECTN/DIRECTN $1 500.00 0.500 1,500.00 50.00 <br /> $1,610.00 LDMPSUM 1.000 $1,610.00 0.200 <br /> 0370 TREE PROTECTION FENCING $322.00 0.200 $322.00 20.00 <br /> $3.50. LINPT 15.000 $52.50 0.000 <br /> 0380 EROSION CONTROL $0.00 0.000 $0.00 0.00 <br /> $325.00 LUMPSUM 1.000 $325.00 0.500 <br /> 0390 10" DRAIN PIPE 162.50 0.500 162.50 <br /> $75.00 LINPT 50.00 <br /> 13.000 $975.00 13.000 <br /> 0400 MINOR ADJUSTMENT OF MANHOLES $975.00 13.000 $975.00 100.00 <br /> $500.00 EACH 1.000 $500.00 0.000 <br /> 0410 MANHOLES OVER EXISTING SEWERS $0.00 0.000 $0.00 0.00 <br /> $3 000.00 EACH 1.000 3,000.00 0.000 <br /> 0420 CATCH BASINS OVER fiX. STRUCTUR $0.00 0.000 $0.00 0.00 <br /> $1,300.00 EACH 2.000 $2,600.00 0.000 <br /> 0430 GENERAL HXCAVATZON $0.00 0.000 $0.00 0.00 <br /> $35.00 CUYD 110.000 $3,850.00 0.000 <br /> 0440 LEVEL 2 1 2 INCH DENSE HMAC $0.00 0.000 $0.00 0.00 <br /> 4.50 S FT 561.000 $2,524.50 0.000 <br /> 0950 PLAZN CONC PVMNT, UNDOWELLED, 0.00 0.000 $0.00 0.00 <br /> $4.00 SQFT 3,156.000 $12,624.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br />