New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4309 Brown PMT 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4309 Brown PMT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:12:55 PM
Creation date
6/19/2008 10:58:35 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004309
GL_Project_Number
955674
Identification_Number
2005100462
COE_Contract_Number
2005-00028
Retention_Destruction_Date
10/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 08/12/2005 09:62:32 <br /> City of Eugene Page 7 <br /> Contract Preliminary Progress Payment <br /> Contractor: BROWN CONT. Paymaat No : 002 <br /> Job 93-004309 Original Contract: <br /> Contract No: 2005-00028 Current Amount: $310,294.00 <br /> PO 2005050487 Contract Award Date: 05/23/2005318,228.54 <br /> Assessable: Yea Completion Date: 10/07/2005 <br /> Line Deacriotion Last Cllag Ord Current Contract <br /> Unit Price Unit Measure _ Quantity Estimated Payment Cumulative Totals <br /> Amount antit i Complete <br /> ~Y Amount ant it Amount <br /> 0800 TREE PROTECTION FENCING <br /> $3.50 LINFT 45.000 <br /> 0810 EROSION CONTROL $157.50 0.000 $0.00 0.000 <br /> $325.00 LUMPSUM $0.00 0.00 <br /> 0820 10" DRAIN PIPE 1.000 $325.00 0.500 <br /> $162.50 0.500 $162.50 <br /> $45.00 LINFT 102.000 50.00 <br /> 0830 CATCH BASZNS $4,590.00 102.000 $4,590.00 102.000 <br /> 1 100.00 EACH $4,590.00 100.00 <br /> 0840 CONNECTION TO EXISTING STRUCTU 3.000 3,300.00 3.000 <br /> 3 300.00 3.000 3 300.00 <br /> $500.00 EACH 100.00 <br /> 0850 1.000 $500.00 1.000 <br /> GENERAL EXCAVATION $500.00 1.000 $500.00 <br /> $35.00 CVYD 170.000 100.00 <br /> 0860 SUBGRADE STABILIZATION $5,950.00 141.400 $4,949.00 141.400 <br /> 50.00 CUYD $4,949.00 83.00 <br /> 0870 91.000 $4 550.00 0.000 <br /> SUBGRADE GEOTEXTILH 0.00 0.000 0.00 <br /> $1.00 SQYD 545.000 0.00 <br /> 0880 3/4 INCH-0 AGGREGATE BASE SURF $545.00 311.100 $311.10 311.100 <br /> $3.00 SQFT $311.10 57.00 <br /> 0890 1 1 2"-0 AGGREGATE BASE 471.000 $1,413.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 20.00 CUYD 91.000 <br /> 0900 LEVEL 2, 1/2 INCH DENSE HMAC $1 820.00 70.700 $1,414.00 70.700 <br /> $5.00 SQFT 1,414.00 78.00 <br /> 0910 PLAZN CONC PVMNT, UNDOWELLED, 328.000 $1,640.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> $4.00 SQPT 4,931.000 $19,724.00 0.000 <br /> 0920 CONCRETE PUMPING $0.00 0.000 $0.00 <br /> 0.20 S FT 5,188.000 0.00 <br /> 0930 5 INCH CONC SURFACING 1 037.60 0.000 <br /> 0.00 0.000 0.00 <br /> $9.00 SQFT 287.000 0.00 <br /> 0940 TOPSOIL $2,583.00 0.000 $0.00 0.000 <br /> $5.00 SQFT 50.00 0.00 <br /> 0950 TIE BARS 163.000 $815.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> $6.00 EACH 40.000 <br /> 0960 SAW CUTTING 5240.00 0.000 <br /> $3.00 LINFT S0.00 0.000 $0.00 0.00 <br /> 0970 292.000 $876.00 300.000 <br /> REMOVE HEDGE $900.00 300.000 <br /> ~ $300.00 LUMPSUM 1.000 $900.00 103.00 <br /> $300.00 1.000 $300.00 1.000 <br /> $300.00 100.00 <br /> 0971 ALLEY #26 - TREE REMOVAL 001 <br /> $850.00 EACH 1.000 <br /> <br /> Alley #27 $850.00 1.000 $850.00 1.000 $850.00 <br /> 100.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.