Run Date: 09/09/2005 10:57:21 <br /> City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $322,619.68 <br /> PO 2005050487 Contract Award Date: 05/23/2005 <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Line Description Laet Chnq Ord Current Contract Estimated Payment <br /> Unit Price Unit Measure Quantity Cumulative Totals i Complete <br /> - Amount Quantity Amount ant it Amount <br /> 0320 CONCRETE PUMPING <br /> $0.20 SQFT 2,064.000 $412.80 0.000 <br /> 0330 SAW LOTTING $0.00 0.000 $0.00 <br /> 0.00 <br /> $3.00 LINPT 222.000 $666.00 0.000 <br /> 0340 TI8 BARS $0.00 367.000 $1,101.00 165.00 <br /> $6.00 811CH 9.000 <br /> ~3~ q'~,s~p $54.00 0.000 $0.00 32.000 <br /> $192.00 356.00 <br /> 0341 ALLEY #9 4" CONCRETE WALK 001 <br /> $g.oo sQFT 13.soo $loe.oo 12.soo <br /> 0343 ALLEY #9 ADJUST TOP OF CB #814 001 $100.00 13.500 $108.00 100.00 <br /> $104.32 LUMPSUM 1.000 $104.32 0.000 <br /> 0344 ALLEY#9 HAND DIG AROUND ROOTS 003 $0.00 1.000 $104.32 100.00 <br /> $829.70 LUMPSUM 1.000 $829.70 0.000 <br /> 0345 ALLEY#9 REM/REPL 4" WW LINE 002 $0.00 1.000 $829.70 100.00 <br /> $1,551.42 LUMPSUM 1.000 <br /> Alley #14 $1,551.42 0.000 $0.00 1.000 $1,551.42 100.00 <br /> 0350 MOBILIZATION <br /> $3,000.00 LUMPSUM 1.000 3,000.00 0.500 <br /> 0360 TEMP PROTECTN/DIRECTN 1,500.00 1.000 $3,000.00 100.00 <br /> $1,610.00 LUMPSUM 1.000 $1,610.00 0,700 <br /> 0370 TREE PROTECTION FENCING $1,127.00 0.900 $1,449.00 90.00 <br /> $3.50 LINFT 15.000 $52.50 0.000 <br /> 0380 EROSION CONTROL $0.00 0.000 $0.00 0.00 <br /> $325.00 LUMPSUM 1.000 $325.00 0.400 <br /> 0390 10" DRAIN PIPE 130.00 0.900 292.50 90.00 <br /> $75.00 LINFT 13.000 $975.00 0.000 <br /> 0400 MINOR ADJUSTMENT OP MANHOLES $0.00 13.000 $975.00 100.00 <br /> $500.00 EACH 1.000 $500.00 1.000 <br /> 0410 MANHOLES OVER EXISTING SEWERS $500.00 1.000 $500.00 100.00 <br /> $3,000.00 EACH 1.000 3 000.00 1.000 <br /> 0420 CATCH BASINS OVER SX. STRUCTUR $3,000.00 1.000 $3,000.00 100.00 <br /> $1,300.00 EACH 2.000 $2,600.00 2.000 <br /> 0430 GENERAL EXCAVATION $2,600.00 2.000 $2,600.00 100.00 <br /> $35.00 CUYD 110.000 $3,850.00 171.600 <br /> 0440 LEVEL 2, 1 2 INCH DENSE HMAC $6,006.00 171.600 $6,006.00 156.00 <br /> 4.50 S FT 561.000 $2,524.50 605.400 <br /> <br /> 0450 PLAIN CONC PVMNT, UNDOWELLED, $2 724.30 605.400 2 724.30 108.00 <br /> $4.00 SQFT 3,156.000 $12,624.00 3,197.800 <br /> $12,791.20 3,197.800 $12,791.20 101.00 <br /> <br />