. 1 <br /> Run Date: 09/09/2005 10:57:21 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No : 003 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $322,619.68 <br /> PO 2005050487 Contract Award Date: 05/23/2005 <br /> Assessable: Yea Completion Date: 10/07/2005 <br /> Line Description Last~ord Current Contract Estimated Payment <br /> Unit Price Unit Measure _ Quantity Cumulative Totals # Complete <br /> WEST UNIVERSITY ALLBYS 4, 9, 14, 24, 26, 27, & 30 Amount Quantity Amount antit Amount <br /> Alley #4 <br /> 0000 Liquidated Damages Phase 1 ($180.00) DAY <br /> 0.000 $0.00 0.000 <br /> 0000 Liquidated Damages Phase 2 $0.00 0.000 $0.00 0.00 <br /> ($100.00) DAY 0.000 $0.00 0.000 <br /> 0000 Li idated Dama ea Phase 3 50.00 0.000 $0.00 0.00 <br /> ($220.00) DAY 0.000 $0.00 0.000 <br /> 0010 MOBILIZATION $0.00 0.000 $0.00 0.00 <br /> $3,500.00 LUMPSUM 1.000 $3,500.00 0.000 <br /> 0020 TEMP PROTECTN/DIRECTN $0.00 1.000 $3,500.00 100.00 <br /> $1,980.00 LUMPSUM 1.000 $1,980.00 0.000 <br /> 0030 TREfi PROTECTION FENCING $0.00 0.900 $1,782.00 90.00 <br /> $3.50 LINFT 25.000 87.50 0.000 <br /> 0040 EROSION CONTROL 0.00 0.000 $0.00 <br /> $325.00 LUMPSUM 0.00 <br /> 1.000 $325.00 0.000 <br /> 0050 10" DRAIN PIPE $0.00 0.900 $292.50 90.00 <br /> $54.00 LINPT 28.000 <br /> 0060 CATCN BASINS $1,512.00 0.000 $0.00 30.300 $1,636.20 <br /> $1,300.00 EACH 108.00 <br /> 2.000 $2,600.00 0.000 <br /> 0070 CONNECTION TO EXISTING PIPE 0.00 2.000 $2 600.00 100.00 <br /> $250.00 EACH 1.000 $250.00 0.000 <br /> 0080 GENERAL EXCAVATION $0.00 1.000 $250.00 100.00 <br /> $30.00 CUYD 85.000 $2,550.00 0.000 <br /> 0090 SUBGRADE STABILIZATION $0.00 77.900 $2,337.00 92.00 <br /> $50.00 CUYD 43.000 $2 150.00 0.000 <br /> 0100 SUBGRADE GEOTEXTILE $0.00 0.000 $0.00 0.00 <br /> $1.00 SQYD 260.000 $260.00 0.000 <br /> 0110 LEVEL 2, 1/2 INCH DENSE HMAC $0.00 0.000 $0.00 0.00 <br /> $5.00 SQFT 290.000 $1,450.00 0.000 <br /> 0120 PLAIN CONC PVMNT, UNDOWELLED, $0.00 212.700 $1,063.50 73.00 <br /> $4.00 S FT 2,324.000 $9,296.00 0.000 <br /> 0130 CONCRETE PUMPING $0.00 2,371.600 $9,486.40 102.00 <br /> $0.20 SQFT 2,324.000 $464.80 0.000 <br /> 0140 1 1/2"-0 AGGREGATE BASE $0.00 0.000 $0.00 0.00 <br /> $20.00 CUYD 43.000 $860.00 0.000 <br /> <br /> 0150 4 INCH CONC WALK $0.00 0.000 $0.00 0.00 <br /> S8.00 SQFT 25.000 5200.00 0.000 <br /> $0.00 39.300 $314.40 157.00 <br /> <br />