" <br /> Run Date: 10/12/2005 09:08:39 <br /> Page 7 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment xo 004 Pinal Pay <br /> Contractor: BROWN CONT. Original Contract: $310,294.00 <br /> Job 93-004309 <br /> Contract No: 2005-00028 Current Amount: $322,619.68 <br /> Contract Award Date: 05/23/2005 <br /> PO 2005050487 C Ietion Date: 10 07/2005 <br /> Assessable: Yes ~P / <br /> Current Contract Eat imated Payment Cumulative Totals i Complete <br /> Line Description Last Chug Ord Unit Price Unit Measure Quantity Amount Quantity Amount ant it Amount <br /> 0772 ALLEY#24 STM DRAIN CHANGES 002 $1,949.20 EACH 1.000 $1,949.20 0.000 $0.00 1.000 $1,949.20 100.00 <br /> 0773 ALLEY#24-EXCAVATION AROUND CON 003 $828.53 LUMPSUM 1.000 $828.53 0.000 $0.00 1.000 $828.53 100.00 <br /> Alley #24 <br /> 0774 REM 3/4'-0" TRANSITION AREA RE 004 $304.63 LUMPSUM 1.000 $304,63 0.000 $0.00 1.000 $304.63 100.00 <br /> 0775 CONST STAMP-NAME/DATE-ALLBY24 006 $78.30 LUMPSUM 1.000 $78.30 0.000 $0.00 1.000 $78.30 100-00 <br /> Alley #26 <br /> 0780 MOBILIZATION $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 1.000 <br /> $3,000.00 100.00 <br /> 0790 TEMP pROTSCTN/DIRECTN $1,610.00 LUMPSUM 1.000 $1,610.00 0.100 $161.00 1.000 $1,610.00 100.00 <br /> 0800 TREE PROTECTION FENCING $3.50 LINFT 45.000 $157.50 0,000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0810 EROSIDN CONTROL $325.00 LUMPSUM 1.000 $325.00 0.100 $32.50 1.000 $325.00 100.00 <br /> 0820 10" DRAIN PIPE $45.00 LINFT 102.000 $4,590.00 0.000 $0.00 102.000 $4,590.00 100.00 <br /> 0830 CATCH BASINS $1,100.00 EACH 3.000 $3,300.00 0.000 $0.00 3.000 <br /> $3,300.00 100.00 <br /> -0840 CONNECTION TO EXISTING STRUCTU $500.00 EACH 1.000 $500.00 0.000 $0.00 1.000 $500.00 100.00 <br /> 0850 GHNHRAL HXCAVATION $35.00 CO'YD 170.000 $5,950.00 0.000 $0.00 300.000 $10,500.00 176.00 <br /> 0860 SUBGRADE STABILIZATION $50.00 CUYD 91,000 $4,550.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0870 SUBGRADE GEOTEXTILE $2.00 $QyD 545.000 $545.00 0.000 $0.00 527.400 <br /> $527.40 97.00 <br /> 0880 3/4 INCH-0 AGGREGATE BASE SURF $3.00 S FT 471.000 $1 413.00 0.000 $0.00 502.000 <br /> $1,506.00 107.00 <br /> 0890 1 1/2"-0 AGGREGATH BASH $20.00 CUYD 91.000 $1,820.00 0.000 $0.00 117.200 <br /> $2,344.00 129,00 <br /> 0900 LEVEL 2, 1/2 INCH DENSE HMAC $5.00 SQFT 328.000 $1,640.00 0.000 $0.00 387.700 <br /> $1,938.50 118.00 <br /> <br /> 0910 PLAIN CONC PVMNT, UNDDWELLED, $4.00 SQFT 4 931.000 $19,724.00 0.000 $0.00 5 051.600 <br /> $20,206.40 102.00 <br /> <br />