. l <br /> Run Date: 20/12/2005 09:08:39 Page 10 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 Final Pay <br /> Contractor: BROWN CONT. Original Contract: $310,294.00 <br /> Job 93-004309 Current Amount: $322,619.68 <br /> Contract No: 2005-00028 Contract Award Date: 05/23/2005 <br /> PO 2005050487 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals & Complete <br /> Line Description Last Chug Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 1190 MOBILIZATION $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 1.000 $3,000.00 100.00 <br /> 1200 TEMP PROTHCTN/DIRSCTN $2,150.00 LUMPSUM 1.000 $2,250.00 0.000 $0.00 1.000 $2,150.00 100.00 <br /> 1210 EROSION CONTROL $325.00 LUMPSUM 1.000 $325.00 0.000 $0-00 1.000 $325.00 100.00 <br /> 1220 10" DRAIN PIPE $45.00 LINFT 53.000 $2,385.00 0.000 $0.00 50-500 $2,272.50 95-00 <br /> 1230 MINOR ADJUSTMENT OF MANHOLES $500.00 EACN 2.000 $1,000.00 0.000 $0.00 2.000 $1,000.00 100.00 <br /> <br /> ~ 1240 CATCIi BASINS $2 100 00 EACH 3 000 $3 300 00 0 000 $0.00 3.000 $3,300.00 100.00 <br /> 1250 CONNECTION TO EXISTING STRUCTU $500.00 EACH 1.000 $500.00 0.000 $0.00 1.000 $500.00 100.00 <br /> 1260 GHDiHRAL BECAVATZON S39.00 CUYD 175.000 $6,825.00 0.000 $0.00 280.400 $10,935.60 160.00 <br /> 1270 SUBGRADH STABILIZATION $50.00 CUYD 93.000 $4,650.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1280 SUBGRADE GEOTEXTILE $1.00 SQYD 530.000 $530.00 0.000 $0.00 556.300 $556.30 105.00 <br /> 1290 3/4 INCH-0 AGGRBGATH HASH SURF $3.00 SQFT 230.000 $690.00 0.000 $0.00 344.000 $1,032.00 150.00 <br /> 1300 1 1/1"-0 AGGRHOATH BASS $10.00 CUYD 90.000 $1,800.00 0.000 $0.00 121.400 $2,428.00 135.00 <br /> 1310 LHVBL 2, 1/2 INCH DSNSH BMAC 55.00 SQFT 190.000 $950.00 0.000 $0.00 243.700 $1,118.50 128.00 <br /> 1320 PLAIN CONC PVMNT, UNDOWELLED, $4.00 SQFT 4,951.000 $19,804.00 0.000 $0.00 5,006.800 $20,027,20 101.00 <br /> 1330 CONCRET$ PUMPING $0.20 S FT 5,100.000 $1,020.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1340 5 INCH CONC SURFACING $9.00 SQFT 294.000 $2,646.00 0.000 $0.00 289.700 $2,607.30 99-00 <br /> 1350 ! INCH CONC HALE $8.00 SQFT 10.000 $160.00 0.000 $0.00 58.500 $!68.00 292.00 <br /> 1360 TOPSOIL $5 00 SQFT 105 000 $525 00 0 000 $0.00 37.000 $185.00 35.00 <br /> 1370 TIE BARS $6.00 EACH 18.000 $108.00 0.000 $0.00 10.000 $60.00 56.00 <br /> 1380 SAW CUTTING $3.00 LINFT 400.000 $1,200.00 0.000 $0.00 957.000 $1,371.00 114.00 <br /> <br />