New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4317
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:53:25 PM
Creation date
6/19/2008 10:32:39 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
Identification_Number
Revised
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. BUDGET ESTIMATE <br /> <br /> ' ~ Page 1 of 1 <br /> Eugene Sand & Gravel, Inc. <br /> P.O. Box 1067 Eugene, Oregon 97440 Phone: (541) 683-5741 FAX: (541) 683-5798 <br /> 04/15/05 <br /> To: City of Eugene, Public Works -Engr. "Voice Ph.: 682-5560 <br /> "FAX Ph.: <br /> Att: Bob Terrell <br /> Owner: City of Eugene <br /> Project: RCC Paving <br /> Budget proposal for Excavation, Grading, TP&DT, RCC Paving <br /> Location: Bike Path Cad West of Polk Str., 100' x 8' = 800 sf <br /> Includes: <br /> Mobilization 1 LS $825.00 <br /> Sawcut 1 LS $110.00 <br /> Excavation 20 If at each end to transition from 5" depth 6 CY $850.00 <br /> to existing top of asphalt level. <br /> 6" depth over-excavation, geotextile fabric and 6" depth 9 CY $2,070.00 <br /> of 1 1/2"-0 crushed rock in excavted area. <br /> 5" depth RCC Paving, placed with paving machine. 32 TN $4,000.00 <br /> Match existing asphalt elevation at each end, overlay <br /> center 60 If of existing asphalt. <br /> Backfill and seed edges of new RCC Bike Path with Loam 1 LS $792.00 <br /> to provide moveable surface at edges. <br /> TP&DT, as required to close portion of Bike Path under 1 LS $1,500.00 <br /> const. TOTAL $10,147.00 <br /> Note: <br /> - DOES NOT INCLUDE: <br /> * Any crack sealing of existing asphalt. <br /> * Removal or replacement of any existing concrete sidewalk broken during this work. <br /> - This proposal assumes removable bollards will be unlocked and removed during this work. <br /> - This is a BUDGET proposal. Actual is contingent on mix design of RCC material used. <br /> - BOLT Wages. <br /> This proposal expires 30 days from date hereof but may be accepted at any later date at the sole option of Eugene S & G. <br /> Eugene Sand & Gravel, Inc. <br /> G.\My Documents\ProposalsvEug. Engr. -RCC Paving Polk BP.xIsJEug. Maint. - Blalr Mike Broadsword <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.