New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4317
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:53:25 PM
Creation date
6/19/2008 10:32:39 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
Identification_Number
Revised
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUDGET ESTIMATE <br /> Page 1 of 1 <br /> Eugene Sand & Gravel, Inc. <br /> P.O. Box 1067 Eugene, Oregon 97440 Phone: (541) 683-5741 FAX: (541) 683-5798 <br /> 04/15/05 <br /> To: City of Eugene, Public Works -Engr. 'voice Ph.: 682-5560 <br /> "FAX Ph.: <br /> Att: Bob Terrell <br /> Owner: City of Eugene <br /> Project: RCC Paving <br /> Budget proposal for Excavation, Grading, TP&DT, RCC Paving <br /> Location: Allen ,between High and Mill Str's, North of 13th., 90' x 14' = 1,260 sf <br /> Includes: <br /> Mobilization 1 LS $1,150.00 <br /> Sawcut 28 LF $224.00 <br /> Demo. existing concrete pavement and excavation, 56 CY $3,024.00 <br /> Includes 6" depth over-excavation <br /> Geotextile Fabric 140 SY $154.00 <br /> 6" depth of 1 1/2"-0 crushed rock 50 TN $1,600.00 <br /> 24" x #4 smooth steel dowels ~ 12" centers, ends ONLY 28 EA $420.00 <br /> 8" depth RCC Paving, 2 lifts, placed with paving machine, 64 TN $6,272.00 <br /> <br /> compacted with 1 large nib. roller and 1 sm. 3 tn. nib. roller. <br /> <br /> TP8~DT, as required to close portion of aitey under const. 1 LS $2,300.00 <br /> <br /> to all traffic during project TOTAL $15,144.00 <br /> Note: <br /> <br /> - This is a BUDGET proposal. Actual is contingent on mix design of RCC material used. <br /> <br /> - BOLI Wages. <br /> This proposal expires 30 days from date hereof but may be accepted at any later date at the sole option of Eugene S & G. <br /> Eugene Sand & Gravel, Inc. <br /> C'\My DocumentslProposals\[Eug. Engr -RCC Paving 13th ALLEY.xIs]Eug. Maint. -Blair Mike Broadsword <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.