New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4317 Eugene Sand & Gravel Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4317 Eugene Sand & Gravel Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:52:42 PM
Creation date
6/19/2008 10:29:37 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
Identification_Number
2008100350
COE_Contract_Number
2008-00017
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r ~ <br /> ~9 STANDARD SPECIFICATIONS <br /> > Z <br /> ~ , ~?d Specifications for Construction (Oregon Specifications} asissued inJune 2002, <br /> '~ndard Drawings (Oregon Drawings), in effect as ofApril 16, 2007, both as revised <br /> o d #4 have been adopted as the Standard Specifications and Standard Drawings for <br /> accordance with City Code. section 7.085. Amendment #3 and #4 is hereby made a <br /> ~ Specifications and Standard Drawings of the City of Eugene as fully and completely as <br /> N~'1 therein. The Standard Specifications, Standard Drawings and alt Addenda may be <br /> ate Engineering office located at 244 E. Broadway, Eugene, OR 97401. <br /> SUPPLEMENTAL SPECIFICATIONS <br /> ,4;. • ~ 'i~he section, subsection and drawing numbers of the Supplemental Specifications correlate to the section <br /> and subsection numbers of the 2002 Oregon Standard Specifications and Standard Drawings. <br /> 00110.20 Definitions <br /> (REVISE) Revise Work Day Definition ORS reference to ORS187.010 <br /> 00150.15(b) Agency Responsibilities <br /> (ADD) "survey" to the first sentence of third bullet after "The Agency will replace" <br /> 00150.50(c) Contractor's Responsibilities <br /> (REVISE) The last bulleted item beginning with "If the Contractor is delayed° is a new paragraph and <br /> not bulleted. <br /> 00150,90(b) `'All Contract Work <br /> (REVISE) The last paragraph to "The date of the Third Notification will be deemed the date of <br /> completion of the Work entitling the Contractor to release of retainage." <br /> 00170.03 Furnishing Right-of--Way and Permits <br /> (REPLACE} The first and second sentences with "For projects pertormed under contract to the City, the <br /> Agency will obtain and pay for the following when they are requinrd by the applicable Laws or <br /> by Plans or Specifications" <br /> 00170.87 Contractor Fee (Applicable January 1, 2008) <br /> (DELETE) Entire sub-section <br /> 00180.10 Responsibility for Contract <br /> (REVISE) The last sentence of the paragraph beginning with "Action by the Agency under" is a new <br /> paragraph added after the bulleted list.' <br /> 00180.20(a) General <br /> i' <br /> (ADD} "On a project funded by the Federal HighwayAdministration (FHWA), the Contractor's own <br /> organization shall. perform Work amounting to at least 30% of the original Contract Amoun~° <br /> l 00180.40(a) General <br /> (ADD} ..Third bullet "Not perform work at the project site on a day not defined as a work day <br /> according tosub-section 110.20.' <br /> Special Specifications 'Page 1 <br /> <br /> r <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.