New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
BJE61794 (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
BJE61794 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:51:29 PM
Creation date
6/19/2008 10:19:43 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Journal Entry
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
Identification_Number
61794
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run Date: 02/01/2008 08:39:50 City of Eugene <br /> Estimate ribution <br /> Estimate: PPP x~C MILL ALLEY - ES Bid <br /> Job 93-004317 PPP ROLLER COMPACTION VARIOUS LOCATIONS <br /> Line No. Description Quantity Unit Unit Price Amount <br /> PPP ROLLER COMPACTION VARIOUS LOCATIONS <br /> ALLEY BTN HIGH & MILL _ <br /> 0010. MOBILIZATION 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0020. TREE PROTECTION 1.00 LUMPSUM $225.00 $225.00 <br /> 0030. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $1,800.00 $1,800.00 <br /> 0040. EROSION CONTROL 1.00 LUMPSUM $200.00 $200.00 <br /> 0050. GENERAL EXCAVATION 50.00 CUYD $60.00 $3,000.00 <br /> 0060. GEOTEXTILE FABRIC 135.00 SQYD $1.50 $202.50 <br /> 0070. 3/4"-0" AGGREGATE BASE 40.00 TON $50.00 $2,000.00 <br /> 0080. LEVEL 1, 1/2" DENSE HMAC 8.00 TON $275.00 $2,200.00 <br /> 0090. RCC PVMT, DOWELED, 7 IN THICK 1,325.00 SQFT $12.20 $16,165.00 <br /> 0100. PREPARE AND TEST RCC MIX DESIGN 3.00 EACH $1,600.00 $4,800.00 <br /> 0110. PLAIN CONCRETE PVMT, DOWELED, 7 IN. THICK 56.00 SQFT $20.00 $1,120.00 <br /> 0120. SAW CUTTING 165.00 LINFT $2.20 $363.00 <br /> 0130. PAINTED PERMANENT PVMT STRIPING, COMPLETE 1.00 LUMPSUM $250.00 $250.00 <br /> 0140. ADJUSTING CATCH BASINS 1.00 EACH $700.00 $700.00 <br /> Total ALLEY BTN HIGH & MILL $38,025.50 <br /> Total PPP ROLLER COMPACTION VARIOUS LOCATIONS $38,025.50 <br /> PPP ROLLER COMPACTION VARIOUS LOCATIONS - Other / Direct <br /> General <br /> 0010. test 1.00 LUMPSUM $8,000.00 $8,000.00 <br /> 0020. Contingency 15~ o€ Contract $5,703.83 <br /> 0030. Advertising 1.00 LUMPSUM $150.00 $150.00 <br /> 0040. Printing 1.00 LUMPSUM $200.00 $200.00 . <br /> Total General $14,053.83 <br /> Total PPP ROLLER COMPACTION VARIOUS LOCATIONS - Other / Direct $14,053.82 <br /> PPP ROLLER COMPACTION VARIOUS LOCATIONS - Miscellaneous <br /> General _ <br /> 0010. Engineering Charge 1.00 LUMPSUM $32,000.00 $32,000.00 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $530.00 $530.00 <br /> Total General $32,530.00 <br /> Total PPP ROLLER COMPACTION VARIOUS LOCATIONS - Miscellaneous $32,530.00 <br /> Total PPP RCC MILL ALLEY - ES Bid $84,609.32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.