<br /> • ~ <br /> Run Date: 08/12/2005 06:55:05 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: WILDISH CONST. <br /> Job 93-004314 Original Contract: $277,498.60 <br /> Contract No: 2005-00031 Current Amount: $292,229.60 <br /> PO q: 200505499 Contract Award Date: 06/02/2005 <br /> Assessable: No Completion Date: 07/29/2005 <br /> Line Description Current Contract Estimated Payment Cumulative Totals 9 Complete <br /> Last Chng Ord Unit Price Unit Measure Quantity Amount antit Amount <br /> Quantity Amount <br /> PPP CRESCENT FRM COBVRO RD TO 130' W OF TULIP ST <br /> General <br /> 0000 Liquidated Damages ($310.00) DAY 0.000 <br /> $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $20,000.00 LUMPSUM 1.000 <br /> $20,000.00 1.000 $20,000.00 1.000 $20,000.00 100.00 <br /> 0020 TEMPORARY WORK ZONE TRAFFIC CO 8,000.00 LUMPSUM 1.000 <br /> 8,000.00 1.000 8,000.00 1.000 8,000.00 100.00 <br /> 0030 EROSION CONTROL $2,500.00 LUMPSUM 1.000 <br /> $2,soo.oo l.ooo $z,soo.oo l.ooo $z,soo.oo loo.oo <br /> 0040 FLAGGING, POLICE $65.00 HOUR 50.000 <br /> $3,25D.00 107.000 $6,955.00 107.000 $6,955.00 21!.00 <br /> 0050 FLAGGING $38.00 HOUR 500.000 <br /> $19,000.00 622.500 $23,655.00 622.500 $23,655.00 125.00 <br /> 0060 SURFACING STABILIZATION $42.00 CGYD 143.000 <br /> $6,006.00 196.000 $8,232.00 196.000 $8,232.00 137.00 <br /> 0070 COLD PLANE PVMT REMOVAL, 2 IN $0.18 SQFT 61,799.000 <br /> $11,123.62 59,299.000 $10,673.82 59,299.000 $10,673.82 96.00 <br /> 0080 COLD PLANE PVMT REMOVAL, 4 IN $0.12 S PT 112 769.000 <br /> 13,532.28 113 737.400 $13,648.49 113 737.400 $13,648.49 101. <br /> 0090 LEVEL 3, 1/2 IN DENSE HMAC $36.00 TON 2,193.000 <br /> $78,948.00 2,244.000 $80,784.00 2,244.000 $80,784.00 M 102.00 <br /> 0100 LEVEL 3, 3/4 IN DENSE HMAC $42.00 TON 1,488.000 <br /> $62,496.00 1,441.950 $60,561.90 1,441.950 $60,561.90 M 97.00 <br /> 0110 TEMPORARY STRIPING $2,000.00 LUMPSUM 1.000 2,000.00 1.000 <br /> $2,000.00 1.000 $2 000.00 100.00 <br /> 0120 THERMOPAST, NON-PROF, 120 MIL, $16,500.00 LUMPSUM 1.000 <br /> $16,500.00 1.000 $16,500.00 1.000 $16,500.00 100.00 <br /> 0130 LOOP DETECTOR INSTALLATION $4,000.00 LUMPSUM 1.000 <br /> $4,000.00 1.000 $4,000.00 1.000 $4,000.00 100.00 <br /> 0140 PVMT LEGEND, TYPE A-1 or A-2: 90.00 EACH 10.000 <br /> 900.00 10.000 $900.00 10.000 $900.00 100.00 <br /> 0150 PVMT LEGEND, TYPE A-1 or A-2: $70.00 EACH 10.000 <br /> $700.00 10.000 $700.00 10.000 $700.00 100.00 <br /> 0160 PVMT LINE, TYPE A-1 or A-2 $2.75 SQFT 400.000 <br /> $1,100.00 407.000 $1,119.25 407.000 $1,119.25 102.00 <br /> 0170 MONO-DIR CRYSTAL TYPE 1 MARKER $2.50 EACH 50.000 <br /> $125.00 50.000 $125.00 50.000 <br /> $125.00 100.00 <br /> <br />