~ l <br /> - <br /> <br /> un Date: 10/07/2005 09:51:44 <br /> City of Eugene Page 2 <br /> Contract preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: WILDISH CONST. Original Contract: $277,498.60 <br /> Job 93-004314 Current Amount: $308,179.60 <br /> <br /> Contract No: 2005-00031 Contract Award Date: 06/02/2005 - <br /> PO 200505499 Completion Date: 07/29/2005 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> ine Description Last Chug Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> <br /> PP CRHSCHNT FRM COBURO RD TO 130' W OF TULIP ST <br /> <br /> eneral <br /> 000 Liquidated Damages ($310.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 010 MOBILIZATION $20,000.00 LUMPSUM 1.000 $20,000.00 0.000 $0.00 1.000 $20,000.00 100.00 <br /> 020 TEMPORARY WORK ZONE TRAFFIC CO $8,000.00 LUMPSUM 1.000 $8,000.00 0.000 $0.00 1.000 $8,000.00 100.00 <br /> <br /> 030 EROSION CONTROL $2,500.00 LUMPSUM 1.000 $2,500.00 0.000 $0.00 1.000 $2,500.00 100.00 <br /> <br /> 040 FLAGGING, POLICH $65.00 HOUR 50.000 $3,250.00 0.000 $0.00 107.000 $6,955.00 214.00 <br /> 050 FLAGGING $38.00 HOUR 500.000 $19,000.00 0.000 $0.00 622.500 $23,655.00 125.00 <br /> <br /> 060 SURFACING STABILIZATION $42.00 COYD 143.000 $6,006.00 0.000 $0.00 200.940 $8,439.48 141.00 <br /> <br /> 070 COLD PLANE PVMT REMOVAL, 2 IN $0.18 SQFT 61,799.000 $11,123.82 0.000 $0.00 59,299.000 $10,673.82 96.00 <br /> <br /> OBO COLD PLANE PVMT REMOVAL, 4 ZN $0.12 SQFT 112,769.000 $13,532.28 0.000 $0.00 113,737.400 $13,648.49 101.00 <br /> <br /> 090 LEVEL 3, 1/2 IN DENSE HMAC $36.00 TON 2,193.000 $78,948.00 0.000 $0.00 2,244.000 $80,784.00 M 102.00 <br /> <br /> 100 LEVEL 3, 3/4 IN DHNSE HMAC $42.00 TON 1,488.000 $62,496.00 0.000 $0.00 1,441.950 $60,561.90 M 97.00 <br /> <br /> 110 TEMPORARY STRIPING $2,000.00 LUMPSUM 1.000 $2,000.00 0.000 $0.00 1.000 $2,000.00 100.00 <br /> <br /> 120 THERMOPAST, NON-PROF, I20 MIL, $16,500.00 LUMPSUM 1.000 $16,500.00 0.000 $0.00 1.000 $16,500.00 100.00 <br /> <br /> 130 LOOP DETECTOR INSTALLATION $4,000.00 LUMPSUM 1.000 $4,000.00 0.000 $0.00 1,000 $4,000.00 100.00 <br /> <br /> 140 PVMT LEGEND, TYPE A-1 or A-2: $90.00 EACH 10.000 $900.00 0.000 $0.00 10.000 $900.00 100.00 <br /> <br /> 150 PVM'l LEGEND, TYPE A-2 or A-2: $70.00 EACH 10.000 $700.00 0.000 <br /> $o.oo lo.oao $700.00 loo.oo <br /> <br /> 260 PVMT LZNS, TYPE A-1 or A-2 $2.75 SQFT 400.000 $1,100.00 0.000 $0.00 407.000 $1,119.25 102.00 <br /> 170 MONO-DZR CRYSTAL TYPE 1 MARKER $2.50 fiACH 50.000 $125.00 0.000 $0.00 50.000 $125.00 200.00 <br /> <br />