Page 1 <br /> Run Date: 5/23/2006 <br /> City of Eugene ~ , P , <br /> Hid Tabulation I V <br /> 2006-000016 ~~.1"Ilo <br /> <br /> Job No. 93-004312 ~W <br /> Pedestrian Crossings at Eight Independent Locations in the City <br /> Engineer's Estimate Brown Contracting Wildish Construction Triton Group <br /> Line <br /> No. Descri tion uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $18,000.00 $18,000.00 $13,000.00 $13,000.00 $14,000.00 $14,000.00 $17,000.00 $17,000.00 <br /> 20 TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1 LUMPSUM $16,000.00 $18,000.00 $6,500.00 $6,500.00 $16,500.00 $16,500.00 $21,000.00 <br /> $21,000.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $3,000.00 $3,000.00 $1,500.00 $1,500.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 <br /> 40 CONCRETE ISLANDS 1060 SQFT $9.00 $9,540.00 $13.50 $14,310.00 $17.00 $18,020.00 $21.50 $22,790.00 <br /> 50 CONCRETE WALKS 3360 SQFT $5.00 $16,800.00 $5.10 $17,136.00 $10.00 $33,600.00 $10.00 $33,600.00 <br /> 60 REMOVAL OF WALKS AND DRIVEWAYS 2800 SQFT $2.50 $7,000.00 $4.30 $12,040.00 $4.00 $11,200.00 $3.00 $8,400.00 <br /> 70 REMOVAL OF SURFACINGS 548 SQFT $2.00 $1,096.00 $3.50 $1,916.00 $3.00 $1,644.00 $8.00 $4,384.D0 <br /> 80 REMOVAL OF CURBS 468 LINFT $4.00 $1,872.00 $12.00 $5,616.00 $2.00 $936.00 $13.00 $6,084.00 <br /> 90 MINOR ADJUSTMENT OF MANHOLES 1 EACH $600.00 $800.00 $650.00 $650.00 $700.00 $700.00 $1,100.00 $1,100.00 <br /> 100 REPLACE STM MH FRAME AND COVER 1 EACH $450.00 $450.00 $450.00 $450.00 $400.00 $400.D0 $200.00 $200.00 <br /> 110 OTHER CONCRETE CURBS 450 LINFT $5.00 $2,250.00 $30.00 $13,500.00 $18.00 $8,100.00 $25.00 $11,250.00 <br /> 120 TRUNCATED DOME DETECTABLE WARNING SYSTEM 448 SQFT $30.00 $13,440.00 $32.00 $14,336.00 $25.00 $11,200.00 $29.00 $12,992.00 <br /> 130 SIGNS IN PLACE 148 SQFT $22.00 $3,256.00 $90.00 $13,320.00 $40.00 $5,920.00 $100.00 $14,800.00 <br /> 140 THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1 LUMPSUM $14,000.00 $14,000.00 $17,400.40 $17,000.00 $16,000.00 $16,000.00 $21,000.00 <br /> $21,000.00 <br /> 150 REMOVE TREE 2 EACH $1,200.00 $2,400.00 $1,100.D0 $2,200.00 $250.00 $500.00 $750.00 $1,500.00 <br /> TOTAL: $111,904.00 $133,476.00 $141,720.00 $179,100.00 <br /> ? 6 <br /> <br />