Run Date: 1/23/2007 City of Eugene <br /> Bid Tabulation 1 <br /> 2007-00001 <br /> Job No. 93-004311 <br /> Glenwood Boulevard Extension at Judkins Point South Interchange on Interstate 5 <br /> Engineer's Estimate Wildish Construction Co. KERR Contractors, Inc. Eugene Sand & Gravel, Inc. Babb Construction Co. Goodfellow Bros, <br /> Ina. <br /> Line <br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> Unit Price Amount <br /> 20 MOBILIZATION 1 LUMPSUM $92,000.00 $92,000.00 $84,500.00 $84,500.00 $83,069.00 $83,069.00 $79,000.00 $79,000.00 $137,859.00 $137,859.00 <br /> $50,775.06 $50,775.06 <br /> 30 TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1 LUMPSUM $153,000.00 $153,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 $35,000.00 $35,000.00 <br /> $60;892.00 $60,892.00 $109,054.19 $109,054.19 <br /> 90 EROSION CONTROL 1 LUMPSUM $7,000.00 $7,000.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $1,500.00 $1,500.00 $350.00 $350.00 $3,013.27 <br /> $3,013.27 <br /> 50 BIOFILTER BAGS 38 EACH $20.00 $760.00 $15.00 $570.00 $30.00 $1,190.00 $15.00 $570.00 $10.50 $399.00 $20.19 <br /> $767.22 <br /> 60 SEDIMENT FENCE, UNSUPPORTED 2355 FOOT $2.15 $5,063.25 $2.00 $4,710.00 $2.00 $4,710.00 $2,00 $4,710.00 $3.50 $8,292.50 <br /> $3.33 $7,892.15 <br /> 70 POLLUTION CONTROL PLAN 1 LUMPSUM $1,000.00 $1,000.00 $250.00 $250.00 $1,000.00 $1,000.00 $500.00 $500.00 $280.00 $280.00 <br /> $606.06 $608.06 <br /> 80 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 LUMPSUM $16,000.00 $16,000.00 $10,000.00 $10,000.00 $80,000.00 $80,000.00 $14,000.00 $14,000.00 $2,200.00 <br /> $2,200.00 $7,546.12 $7,598.12. <br /> 90 CLEARING AND GRUBBING 1 LUMPSUM $50,000.00 $50,000.00 $30,000.00 $30,000.00 $25,000.00 $25,000.00 $17,000.00 $17,000.00 , $14,369.00 <br /> $14,369.00 $11,907.19 $11,907.19 <br /> 100 GENERAL EXCAVATION 19760 CUYD $9.00 $132,890.00 $10.00 $197,600.00 .$7.50 $110,700.00 $10.30 $152,028.00 $17.65 $260,519.00 <br /> $13.20 $194,832,00 <br /> 110 SUBGRADE STABILIZATION 800 CUYD $30.00 $24,000.00 $35.00 $28,000.00 $14.00 $11,200.00 $32.00 $25,600.00 $33.00 $26,900.00 $92.94 <br /> $73,952.00 <br /> 120 SUBGRADE GEOTEXTILE 6587 SQYD $0.50 $3,293.50 $1.00 $6,587.00 $1.00 $6,587.00 $0.70 $9,610.90 $1.00 $6,587.00 $1.41 <br /> $9,287.67 <br /> 130 CONSTRUCTION SURVEY WORK 1 LUMPSUM $30,000.00 $30,000.00 $10,000.00 $10,000.00 $13,000.00 $13,000.00 $28,500.00 $28,500.00 $28,160.00 <br /> $28,160.00 $29,652.62 $29,652.62 <br /> 140 12 INCH STORM PIPE 176 FOOT $90.00 $7,040.00 $55.00 $9,680.00 $50.00 $8,600.00 $44.00 $7,744.00 $38.50 $6,776.00 <br /> $45.17 $7,949.92 <br /> 150 36 INCH CONCRETE STORM PIPE 356 FOOT $150.00 $53,400.00 $110.00 $39,160.00 $115.00 $40,940.00 $137.00 $98,772.00 $102.00 $36,312.00 <br /> $195.61 $51,837.16 <br /> 160 8 INCH PVC WW PIPE 88 FOOT $85.00 $7,480.00 $70.00 $6,160.00 $50.00 $4,400.00 $77.00 $6,776.00 $51.00 $4,468.00 $57.07 <br /> $5,022,16 <br /> 170 10 INCH PVC WW PIPE 709 FOOT $115.00 $81,535.00 $68.00 $48,212.00 $55.00 $38,995.00 $65.00 $46,085.00 $57.00 $90,413.00 <br /> $87.41 $61,973.69 " <br /> 180 SLOPE END SECTIONS, 36 INCH 1 EACH $1,900.00 $1,400.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 $1,150.00 $1,150.00 $7,969.04 <br /> $7,464.04 <br /> 190 CONCRETE PIPE ANCHORS 9 EACH $750.00 $3,000.00 $600.00 $2,400.00 $750.00 $3,000.00 $800.00 $3,200.00 $1,155.00 $4,620.00 $1,959.45 <br /> $7,837.60 <br /> 200 CATCH BASINS W/ BIKE PROOF GRATE 1 EACH $2,200.00 $2,200.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,065.00 $1,065.00 $2,129.00 $2,124.00 $2,175.2 <br /> $2,175.29 <br /> 210 TRASH RACK, 36" 2 EACH $250.00 $500.00 $750.00 $1,500.00 $1,300.00 $2,600.00 $700.00 $1,900.00 $900.00 $1,800.00 $12,738.15 <br /> $25,976.30 <br /> 220 CONCRETE MANHOLE, 60 INCH 2 EACH $4,700.00 $9,400.00 $4,200.00 $8,900.00 $3,500.00 $7,000.00 $4,000.00 $8,000.00 $4,500.00 $9,000.00 $5,938.09 <br /> $10,876.18 <br /> 230 CONCRETE MANHOLE, 84 INCH 1 EACH $6,500.00 $6,500.00 $8,000.00 $8,000.00 $5,500.00 $5,500.00 $7,200.00 $7,200.00 $9,800.00 $9,800.00 $9,199.39 <br /> $9,199.39 <br /> 290 CONCRETE STORM DRAIN MANHOLES 1 EACH $4,000.00 $9,000.00 $1,500.00 $1,500.00 $2,600.00 $2,600.00 $2,400.00 $2,900.00 $2,.800.00 $2,800,00 $3,960.50 <br /> $3,960.50 <br /> 250 CONCRETE MANHOLE, WW 2 EACH $3,900.00 $7,800.00 $2,500.00 $5,000.00 $2,800.00 $5,600.00 $2,400.00 $9,800.00 $1,458.00 $2,916.00 $3,358.18 <br /> $6,716.36 <br /> 'S1 CONCRETE MANHOLE, WW EXT DROP 1 EACH $5,000.00 $5,000.00 $16,000.00 $16,000.00 $3,500.00 $3,500.00 $9,000.00 $9,000.00 $10,468.00 $10,468,00 $6,915 <br />62 $6,915.62 <br /> ~0 MANHOLES OVER EXISTING SEWERS 1 EACH $2,650.00 $2,650.00 $2,500.00 $2,500.00 $2,200,00 $2,200.00 $2,350.00 $2,350.00 $1,500.00 $1,500.00 $2,297.68 <br /> $2,297.68 <br /> 270 CONNECT TO EXST WW STRUCTURE 2 EACH $2,900.00 $5,800.00 $500.00 $1,000.00 $600.00 $1,200.00 $475.00 $950.00 $500.00 $1,000.00 $3,611.58 <br /> $7,623.16 <br /> 280 STORM WATER OUTFACE 4 EACH $2,250.00 $9,000.00 $2,000.00 $8,000.00 $500.00 $2,000.00 $800.00 $3,200.00 $705.00 $2,820.00 $395.44 <br /> $1,581.76 <br /> 290 COLD PLANE PVMT REMOVAL, VARIOUS DEPTH 8000 SQFT $0.65 $5,200.00 $1.20 $9,600.00 $1.00 $8,000.00 $1.90 $11,200.00 $1.05 $8,400,00 <br /> $1.09 $8,720.00 <br /> 300 AGGREGATE BASE, 8 INCH THICK 238 SQYD $5.00 $1,190.00 $10.00 $2,380.00 $8.00 $1,904.00 $13.00 $3,094.00 $6.75 $2,082.50 <br /> $18.04 $4,293.52 <br /> 310 AGGREGATE BASE, 14 INCH THICK 6090 SQYD $11.00 $66,440.00 $12.00 $72,480.00 $10.00 $60,400.00 $12.00 $72,980.00 $6.55 $51,642.00 <br /> $12.98 $78,399.20 <br /> 320 LEVEL 3, 1/2 INCH DENSE, HMAC 720 TON $96.00 $33,120.00 $50.00 $36,000.00 $70.00 $50,400.00 $62.00 $44,690.00 $65.00 $46,800.00 <br /> $77.09 $55,504.80 <br /> 330 LEVEL 3, 3/4 INCH DENSE, HMAC 2480 TON $98.00 $119,040.00 $58.00 $143,840.00 $65.00 $161,200.00 $56.50 $145,080.00 $60.00 <br /> $148,800.00 $71.16 $176,976.80 <br /> 390 LEVEL 3, 3/4 INCH DENSE HMAC IN TEMPORARY 53 TON $75.00 $3,975.00 $75.00 $3,975.00 $60.00 $4,240.00 $92.00 $4,876.00 $100.00 <br /> $5,300.00 $118.61 $6,286.33 <br /> 350 CONCRETE CURB AND GUTTER 380 FOOT $20.00 $7,600.00 $16.00 $6,080.00 $15.00 $5,700.00 $20.00 $7,600.00 $16.10 $6,118.00 <br /> $29.81 $9,427.80 <br /> 370 CONCRETE WALKS 455 SQFT $9.50 $2,047.50 $9.OD $9,095.00 $6.00 $2,730.00 $8.50 $3,867.50 $8.00 $3,640.00 $9.73 $9,427.15 <br /> 380 GUARDRAIL, TYPE 2A 390 FOOT $25.00 $9,750.00 $29.00 $9,360.00 $27.00 $10,530.00 $25.00 $9,750.00 $24.00 $9,360.00 $28.47 <br /> $11,103.30 <br /> 390 CONNECT TO EXISTING GUARD RAIL 1 EACH $450.00 $950.00 $500.00 $500.00 $250.00 $250.00 $210.00 $210.00 $500.00 $500.00 <br /> $593.06 $593.06 <br /> 400 GUARDRAIL ANCHORS, TYPE 1 l EACH $850.00 $850.00 $1,000.00 $1,000.00 $750.00 $750.00 $750.00 $750.00 $1,000.00 $1,000.00 $1,186.10 <br /> $1,186.10 <br /> 410 GUARDRAIL END PIECES, TYPE B 1 EACH $275.00 $275.00 $100.00 $100.00 $100.00 $100.00 $85.00 $85.00 $100.00 $100.00 <br /> $118.62 $118.62 <br /> 420 GUARDRAIL TERMINALS, FLARED 2 EACH $2,500.00 $5,000.00 $2,500.00 $5,000.00 $2,300.00 $4,600.00 $2,125.00 $4,250.00 $2,500.00 $5,000.00 <br /> $965.26 $1,930.52 <br /> 430 DELINEATORS, TYPE 3 9 EACH $50.00 $450.00 $50.00 $950.00 $200.00 $1,800.00 $60.00 $590.00 $59.00 $531.00 $65.23 $587.07 <br /> 440 PVMT LEGEND, TYPE A-2:ARROWS 4 EACH $400.00 $1,600.00 $175.00 $700.00 $100.00 $400.00 $175.00 $700.00 $175.00 $700.00 <br /> $207.57 $830.28 <br /> 450 PVMT LINE, TYPE A-2 160 SQFT $5.50 $880.00 $6.00 $960.00 $6..00 $960.00 $5.60 $896.00 $5.60 $896.00 $6.64 <br /> $1,062.40 <br /> 460 PVMT LEGEND, TYPE A-2: BICYCLE LANE SYMBOLS 2 EACH $250.00 $500.00 $185.00 $370.00 $200.00 $400.00 $185.00 $370.00 $165.00 <br /> $370.00 $219.43 $438.86 <br /> 470 BI-DIRECTIONAL YELLOW TYPE I MARKERS 35 EACH $5.50 $192.50 $4.00 $190.00 $5.00 $175.00 $4.00 $190.00 $4,00 $140.00 <br /> $9.74 $165.90 <br /> 480 PVMT LINE, METHOD B OR F 4000 FOOT $2.00 $8,000.00 $1.40 $5,600.00 $2.00 $8,000.00 $1.35 $5,900.00 $1.35 $5,400.00 $1.60 <br /> $6,400.00 <br /> 500 REMOVE AND REINSTALL EXISTING SIGNS 1 LUMPSUM $12,000.00 $12,000.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $8,000.00 $8,000.00 $6,500.00 <br /> $6,500.00 $7,709.69 $7,709.69 <br /> 510 WOOD SIGN POSTS 56 FBM $7.00 $406.00 $100.00 $5,800.00 $80.00 $4,640.00 $8.00 $964.00 $8.00 $464.00 $9.49 $550.42 <br /> 520 SQUARE TUBE SIGN SUPPORTS 2 EACH $175.00 $350.00 $975.00 $950.00 $350.00 $700.00 $235.00 $470.00 $235.00 $470.00 $278.73 <br /> $557.96 <br /> 530 TYPE "R" SIGNS IN PLACE 13 SQFT $20.00 $260.00 $20.00 $260.00 $20.00 $260.00 $25.00 $325.00 $25.00 $325.00 <br /> $29.65 $385.95 <br /> 540 TYPE "G" SIGNS IN PLACE 65 SQFT $20.00 $1,700.00 $90.00 $3,900.00 $40.00 $3,400.00 $30.00 $2,550.00 $30.00 $2,550.00 <br /> $35.58 $3,029.30 <br /> 550 TYPE Y1 SIGNS IN PLACE 3 SQFT $20.00 $60.00 $20.00 $60.00 $40.00 $120.00 $25.00 $75.00 ` $25.00 $75.00 $29.65 <br /> $88.95 <br /> ~0 TYPE" Wl" SIGNS IN PLACE 19 SQFT $20.00 $380.00 $20.00 $380.00 $20.00 $380.00 $25.00 $975.00 $25.00 $475.00 <br /> $29,65 $563.35 <br /> X10 LOOP DETECTOR CONDUIT & JB'S COMPLETE 1 LUMPSUM $7,500.00 $7,500.00 $17,000.00 $17,000.00 $8,600.00 $8,800.00 $17,000.00 $17,000.00 $16,932.00 <br /> $16,.932.00 $20,083.13 $20,083.13 <br /> 580 PERMANENT SEEDING 1 LUMPSUM $12,220.00 $12,220.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $9,600.00 $4,600.00 $6,698.00 $6,698.00 $2,965.26 <br /> $2,965.26 ' <br /> 590 SHRUB, 15 GAL 23 EACH $17.00 $391.00 $120.00 $2,760.00 $40.00 $920.00 $170.00 $3,910.00 $191.00 $9,393.00 $142.34 $3,273.82 <br /> <br /> Total: $1,023,488.75 $852,469.00 $871,000.00 $671,158.40 ~,I $1,019,696.00 .$1,125,300.00 <br /> <br />