Run Date:~06/07/2007 11:33:53 <br /> ~ ~ City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: WILDISH CONSTRUCTION <br /> Job 93-004311 Original Contract: $852,469.00 <br /> Contract No: 2007-00015 Current Amount: $892,316.00 <br /> PO 2007100304 Contract Award Date: 02/28/2007 <br /> Assessable: No Completion Date: 07/15/2007 <br /> Line Description Cuzrent Contract Estimated Payment Cumulative Totals <br /> Last Cbng Ord Unit Price Unit Measure Quantity Amount Quantity Amount ~ Complete <br /> Quantity Amount <br /> 0470 BI-DIRECTIONAL YELLOW TYPE I M $4.00 EACH 35.000 <br /> $140.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0480 pVMT LINE, METHOD B OR F $1.40 FOOT 4,000.000 <br /> $5,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0500 REMOVE AND REINSTALL BXISTING $2,000.00 LUMPSUM 1.000 <br /> $2,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0510 WOOD SIGN POSTS - $100.00 FBM 58.000 <br /> $5,800.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0520 SQUARB TUBE SIGN SUPPORTS $475.00 EACH 2.000 <br /> S9so.oo o.ooo $o.oo o.ooo So.oo o.oo <br /> 0530 TYPE "R" SIGNS IN PLACE ~ $20.00 SQFT 13.000 <br /> $260.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0540 TYPE "G" SIGNS IN PLACE $40.00 SQFT 85.000 <br /> $3,400.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0550 TYPE Y1 SIGNS IN PLACE $20.00 S FT 3.000 <br /> S6o.oo o.ooo $o.oo o.ooo $o.oo o.oo <br /> 0560 TYPE" W1" SIGNS IN PLACE $20.00 SQFT 19.000 <br /> $380.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0570 LOOP DETBCTOR CONDUIT 6 JB'S C $17,000.00 LUMPSUM <br /> 1.000 $17,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> OSSO PERMANENT SEEDING $2,500.00 LUMPSUM 1.000 <br /> 0590 SHRUB, 15 GAL $2,500.00 0.000 $0.00 0.000 0.00 <br /> $120.00 EACH $0.00 <br /> 23.000 $2,760.00 0.000 $0.00 0.000 $0.00 <br /> 0.00 <br /> 00 IMPORT STONE EMBANKMENT 001 $20.00 TON <br /> 1,850.000 $37,000.00 231.850 $4,637.00 914.850 $18,297.00 <br /> 49.00 <br /> O MOVE WW MH 15508-ETA 6+32.29 002 ($4,673.00) LUMPSUM <br /> 1.000 ($4,673.00) 0.000 $0.00 0.000 $0.00 0.00 <br /> 0620 CONSTRUCT' STM MH 1+50 002 $3,600.00 LUMPSUM <br /> 1.000 $3,600.00 1.000 $3,600.00 1.000 $3,600.00 100.00 <br /> 0630 STM DRAIN PIPE, 24" ADS 002 $69.00 FT 180.000 <br /> $12,420.00 177.000 $12,213.00 177.000 $12,213.00 98.00 <br /> <br /> 0640 CONST LARGE STM DRAIN OUTFACE 002 $6,500.00 LUMPSUM <br /> 1.000 $6,500.00 1.000 $6,500.00 1.000 $6,500.00 100.00 <br /> $892,316.00 $188,813.00 $287,738.00 <br /> <br />