Run Date: 01/05/2007 11:25:38 Page 3
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 003
<br /> Contractor: WILDISH CONSTRUCTION Original Contract: $852,469.00
<br /> Job 93-004311 Current Amount: $892,316.00
<br /> Contract No: 2007-00015 Contract Award Date: 02/28/2007
<br /> PO 2007100304 Completion Date: 07/15/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals t Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0230 CONCRETE MANHOLE, 84 INCN $8,000.00 EACH 1.000 $8,000.00 1.000 $8,000.00 1.000 $8,000.00 100.00
<br /> 0240 CONCRETE STORM DRAIN MANHOLES $1,600.00 EACH 1.000 $1,500.00 0 000 $0 00 0 000 $0 00 0 00
<br /> 0250 CONCRETE MANHOLE, WW $2,500.00 EACH 2.000
<br /> $5,000.00 2.000 $5,000.00 2.000 $5,000.00 100.00
<br /> 0251 CONCRETE MANHOLE, WW EXT DROP $16,000.00 EACH 1.000
<br /> $16,000.00 1.000 $16,000.00 1.000 $16,000.00 100.00
<br /> 0260 MANHOLES OVER EXISTING SEWERS $2,500.00 EACH 1.000 $2 500 00 0 000 $0 00 0 000
<br /> $0 00 0 00
<br /> 0270 CONNECT TO EXST WW STRUCTURE $500.00 EACH 2.000 $1,000.00 2.000 $1,000.00 2.000 $1,000.00 100.00
<br /> 0280 STORM WATER OUTFACE 002 $2,000.00 EACH 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0290 COLD PLANE PVMT REMOVAL, VARIO $1.20 SQFT 8,000.000
<br /> $9 600 00 0 000 $0 00 0 000 $0 00 0 00
<br /> 0300 AGGREGATE BASE, 8 INCH THICK $10.00 SQYD 238.000 '$2,380.00 119.500
<br /> $1,195.00 119.500 $1,195.00 50.00
<br /> 0310 AGGREGATE BASfi, 19 INCH THICK $12.00 SQYD 6,040.000 $72,480.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0320 LEVEL 3, 1/2 INCH DENSE, HMAC $60.00 TON 720.000 $36 000 00 0 000 $0 00 0 000 $0 00 0 00
<br /> 0330 LEVEL 3, 3/4 INCH DENSE, HMAC $58.00 TON 2,480.000 $143,840.00 0.000 $0.00 0.000 $0.00 M 0.00
<br /> 0340 LSVSL 3, 3/! INCH DHNSS ®(AC I $75.00 TON 53.000 $3,975.00 77.800 $5,835.00 77.800 $5,835.00 147.00
<br /> 0350 CONCRETE CURB AND GUTTER $16.00 FOOT 380.000 $6 080.00 0.000 $0.00 0.000 $0 00 0 00
<br /> 0370 CONCRETE WALKS $9.00 SQPT 455.000 $4,095.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0380 GUARDRAIL, TYPE 2A $24.00 FOOT 390.000 $9,360.00 0.000
<br /> $0.00 0.000 $0.00 0.00
<br /> 0390 CONNECT TO EXISTING GUARD RAIL $500.00 EACH 1.000
<br /> $500.00 0.000 $0.00 0.000 $0.00 0 00
<br /> 0400 GUARDRAIL ANCHORS, TYPE 1 $1,000.00 EACH 1.000
<br /> $1,000.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0410 GUARDRAIL END PIECES, TYPE B $100.00 EACH 1.000
<br /> $loo.oo o.ooo $o.oo o.ooo $o.oo o.oo
<br /> 0420 GUARDRAIL TERMINALS, FLARED $2,500.00 EACH 2.000
<br /> $s,ooo.oo o.ooo $o.oo o.ooo $0 00 0.00
<br /> 0430 DELINEATORS, TYPE 3 $50.00 EACH 9.000 $450.00 0.000
<br /> $0.00 0.000 $0.00 0.00
<br /> 0440 PVMT LEGEND, TYPE A-2:ARROWS $175.00 EACH 4.000 $700.00 0.000
<br /> $0.00 0.000 $0.00 0.00
<br />
<br /> 0450 PVMT LINE, TYPE A-2 $6.00 SQFT 160.000
<br /> $960.00 0.000 $0 00 0 000 $0 00 0.00
<br />
<br /> 0460 PVMT LEGEND, TYPE A-2: BICYCLE $185.00 EACH 2.000
<br /> $370.00 0.000 $0.00 0.000 $0.00 0.00
<br />
<br />
|