Run J1dte' OB/fll /2007 10:32:31 Page 2
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> • Payment No 009
<br /> Contractor: WZLDISH CONSTRUCTION Original Contract: $852,469.00
<br /> Job 93-004311 Current Amount: $892,316.00
<br /> Contract No: 2007-00015 Contract Award Date: 02/28/2007
<br /> PO 2007100304 Completion Date: 07/15/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Canplete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br />
<br /> JUDICINS POINT S/GLENWOOD BLVD BdTSNSION
<br /> General
<br /> 0000 Liquidated Damages ($600.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0020 MOBILIZATION $84,500.00 LUMPSUM 1.000 $84,500.00 0.000 $0.00 1.000 $84,500.00 100.00
<br /> 0030 TEMP. WORK ZONE TRAFFIC CONTRO $30,000.00 LUMPSUM 1.000 $30,000.00 0.350 $10,500.00 0.750 $22 500.00 75.00
<br /> 0040 EROSION CONTROL $3,000.00 LUMPSUM 1.000 $3,000.00 0.500 $1,500.00 0.900 $2,700.00 90.00
<br /> 0050 BIOFILTER BAGS $15.00 EACH 38.000 $570.00 0.000 $0.00 12.000 $180.00 32.00
<br /> 0060 SEDIMENT FENCE, UNSUPPORTED $2.00 FOOT 2,355.000 $4,710.00 0.000 $0.00 869.000 $1,738.00 37.00
<br /> 0070 POLLUTION CONTROL PLAN $250.00 LUMPSUM 1.000 $250.00 0.000 $0.00 1.000 $250.00 100.00
<br /> 0080 REMOVAL OF STRUCTURES AND OBST $10,000.00 LUMPSUM 1.000 $10,000.00 0.400 $4,000.00 1.000 $10,000.00 100.00
<br /> 0090 CLEARING AND GRUBBING $30,000.00 LUMPSUM 1.000
<br /> $30,000.00 0.000 $0.00 1.000 $30,000.00 100.00
<br /> 0100 GENERAL EXCAVATION $10.00 CUYD 14,760.000 $147,600.00 2,000.000 $20,000.00 14,000.000 $140,000.00 M 95.00
<br /> 0110 SUBGRADE STABILIZATION 001 $35.00 CUYD 600.000
<br /> $21,000.00 170.000 $5,950.00 170.000 $5,950.00 28.00
<br /> 0120 SUBGRADE GEOTEXTILE $1.00 SQYD 6,587.000 $6,587.00 2,516.000 $2,516.00 3,741.000 $3,741.00 57.00
<br /> 0130 CONSTRUCTION SURVEY WORK $10,000.00 LUMPSUM 1.000 $10,000.00 0.300 $3,000.00 0.800 $8,000.00 80.00
<br /> 0140 12 INCH STORM PIPE $55.00 FOOT 176.000
<br /> $9,680.00 69.000 $3,795.00 158.000 $8,690,00 90.00
<br /> 0150 36 INCH CONCRETE STORM PIPE $110.00 FOOT 356.000 $39,160.00 0.000 $0,00 350.000 $38,500.00 98.00
<br /> 0160 8 INCH PVC WW PIPE $70.00 FOOT 88.000 $6,160,00 0.000 $0,00 157.000 $10,990.00 178,00
<br /> 0170 10 INCH PVC WW PIPE $68.00 FOOT 709.000
<br /> $48,212,00 0.000 $0.00 648.000 $44,064.00 91.00
<br /> 0180 SLOPE END SECTIONS, 36 INCH $1,000.00 EACH 1.000 $1,000.00 0.000
<br /> $0.00 0.000 $0.00 0.00
<br /> 0190 CONCRETE PIPE ANCHORS $600.00 EACH 4.000
<br /> $2,400.00 0.000 $0.00 4.000 $2,400.00 100.00
<br /> 0200 CATCH BASINS W/ BIKE PROOF GRA $1,000.00 EACH 1.000 $1,000.00 1.000 $1,000.00 1.000 $1,000.00 100.00
<br /> 0210 TRASH RACK, 36" $750.00 EACH 2.000
<br /> $1,500.00 0.000 $0.00 2.000 $1,500.00 100.00
<br /> 0220 CONCRETE MANHOLE, 60 INCH $4,200.00 EACH 2.000 $8,400.00 0.000 $0.00 2.000 $8,400.00 100.00
<br />
<br />
|