Run Date:,O9/11/2007 09:04:10 Page 2
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 005 Final Pay
<br /> Contractor: WILDISH CONSTRUCTION Original Contract: $852,469.00
<br /> Job 93-004311 Current Amount: $892,316.00
<br /> Contract No: 2007-00015 Contract Award Date: 02/28/2007
<br /> PO 2007100304 Completion Date: 07/15/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals & Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> JO'DRINS POINT S/GLBNKOOD BLVD HZTSNSION
<br /> General
<br /> 0000 Liquidated Damages ($600.00) DAY 0.000
<br /> $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0020 MOBILIZATION $84,500.00 LUMPSUM 1.000 $84,500.00 0.000 $0.00 1.000 $84,500.00 100.00
<br /> 0030 TEMP. WORK ZONE TRAFFIC CONTRO $30,000.00 LUMPSUM 1.000
<br /> $30,000.00 0.250 $7,500.00 1.000 $30,000.00 100.00
<br /> 0040 EROSION CONTROL $3,000.00 LUMPSUM 1.000
<br /> $3,000.00 0.100 $300.00 1.000 $3,000.00 100.00
<br /> 0050 BIOFZLTER HAGS $15.00 EACH 38.000
<br /> $57b.00 0.000 $0.00 12.000 $180.00 32.00
<br /> 0060 SEDIMENT FENCE, UNSUPPORTED $2.00 FOOT 2 355 000
<br /> $4,710.00 0.000 $0.00 869.000 $1,738.00 37 00
<br /> 0070 POLLUTION CONTROL PLAN $250.00 LUMPSUM 1.000
<br /> $250.00 0.000 $0.00 1.000 $250.00 100.00
<br /> 0080 REMOVAL OF STRUCTURES AND OBST $10,000.00 LUMPSUM 1.000
<br /> $10,000.00 0.000 $0.00 1.000 $10,000.00 100.00
<br /> 0090 CLEARING AND GRUBBING $30,000.00 LUMPSUM 1.000
<br /> $30,000.00 0.000 $0.00 1.000 $30,000.00 100.00
<br /> 0100 GENERAL EXCAVATION $10.00 CUYD 14,760.000 $197,600.00 271.000
<br /> $2,710.00 14,271.000 $142,710.00 M 97.00
<br /> 0110 SUBGRADE STABILIZATION 001 $35.00 CUYD 600.000
<br /> $21,000.00 9.200 $322.00 179.200 $6,272.00 30.00
<br /> 0120 SUBGRADE GEOTEXTILE $1.00 SQYD 6 587 000 $6,587.00 2,846.000 $2,846.00 6,587.000
<br /> $6,587.00 100 00
<br /> 0130 CONSTRUCTION SURVEY WORK $10,000.00 LUMPSUM 1.000
<br /> $lo,ooo.oo o.zoo $z,ooo.oo l.ooo $lo,ooo.oo loo.oo
<br /> 0140 12 INCH STORH PIPE $55.00 FOOT 176.000
<br /> $9,680.00 0.000 $0.00 158.000 $8,690.00 90.00
<br /> 0150 36 INCH CONCRETE STORM PIPE $110.00 FOOT 356.000
<br /> $39,160.00 4.000 $440.00 354.000 $38,940.00 99.00
<br /> 0160 8 INCH PVC NN PIP8 $70.00 FOOT 88.000
<br /> $6,160.00 0.000 $0.00 157.000 $10,990.00 178.00
<br /> 0170 10 INCH PVC WW PIPE $68.00 FOOT 709.000
<br /> $48,212.00 0.000 $0.00 648.000 $44,064.00 91.00
<br /> 0180 SLOPE END SECTIONS, 36 INCH $1,000.00 EACH 1.000 $1,000.00 0.000 $0.00 0.000
<br /> $0 00 0 00
<br /> 0190 CONCRETE PIPE ANCHORS $600.00 EACH 4.000
<br /> $2,400.00 0.000 $0.00 4.000 $2,400.00 100.00
<br />
<br /> 0200 CATCH BASINS W/ BIKE PROOF GRA $1,000.00 EACH 1.000
<br /> $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00
<br />
<br /> 0210 TRASH RACK, 36" $750.00 EACH 2.000
<br /> $1,500.00 0.000 $0.00 2.000 $1,500.00 100.00
<br />
<br /> 0220 CONCRETE MANHOLE, 60 INCH $4,200.00 EACH 2.000
<br /> $8,400.00 0.000 $0.00 2.000 $8,400.00 100.00