New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4326 PBS 06.11.07
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4326 PBS 06.11.07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:35:45 PM
Creation date
6/18/2008 3:03:05 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004326
GL_Project_Number
955166
Identification_Number
Revised
Retention_Destruction_Date
2/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~r~ <br /> .h 4,3~ ~ } .h <br /> <br /> ' PrOjeCt Name: Amazon Creek Outfall/StreambankAStabilization, Terry St to PoIkSStreet <br /> Project Manager Name: Jenifer Wilier - - <br /> 3@MC@ ID # (a.g. Good Job Number 004161): 4326 Contract # (e.g. 2oo4.asos): Capital Protect # (e.g. oos244): 955168 <br /> j,~ ~ ~ y, <br /> '~"fi? "'t' fit' ~ h .Y y~i. :'K `4' ~ ~~,~:an ~~lZ. ~ <br /> i yt ~ k f ~~'M~Ir?t fi~~ <br /> ~ k. ~ <br /> Wastewater E/Ig?b/e: Non-assessable components of projects attributable to future develapment that drain those portions of pipes within the total area served by <br /> the project (Quantity portions of project that are capacity enhancing; pro-rate design/construction management casts on a proportionate basis.] <br /> Stormwater Eligible: Non-assessable components of pipe or open channel projects attributab/e to future development that drain impervious surface areas within <br /> the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that wilt serve new <br /> development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br /> development. Subtract from 100% to derive the percentage of project that will serve new development.] <br /> Tiansportatlon Eligible: Non-assessable components attributable to future development of 1) arterial and collector street projects and related traffic signals, and <br /> 2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br /> basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br /> attributed to new development between year o/construction and build out]. <br /> Parks E/Jpib/e: Components o/Neighborhood or Community park projects attributable to future development. (Quantify portions of project that are capacity <br /> enhancing versus those portions needed to serve existing users. Pro-rate desigNconstruction management costs on a proportionate basis.] <br /> k?ip `~tati~ ~:~lO~tis~01'.ttrW'' <br /> Wastewater E/Ig/b/e: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Stormwafer ENgib/e: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Transportat/on Eligible: Per Council Resolution No. 4718, reimbursement fees wild bbe budgeted for preservation and maintenance of the existing system <br /> (Council or the Budget Committee may subsequently allocate some or all /or a different purpose as allowed by law). No transportation reimbursement SDC <br /> revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are al/owed for paths. _ _ <br /> Parks E/Iglb/e: No parks SOC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br /> t~: <br /> ~ ~ <br /> . <br /> Wastewater Improve. Fee $ % $ % $ % <br /> Approved Amounts, if different: $ - $ - - - - - - - <br /> r _ <br /> Stortnwater Improve. Fee $ % $ % $ "/o <br /> % $ - - - <br /> Approved Amounts, if different: $ % $ - <br /> ~ # . ,826.OD <br /> 2 <br /> Transportation Improve. Fee $ % $ % $ % <br /> Approved Amounts, if different: $ % $ % $ % <br /> F@a ~ S - Z <br /> ~Ipd±lint~F. M i ~ <br /> $ <br /> Pwlp~~. Fa@ ffi NNR NtA S NfA <br /> Y- <br /> 4 a M <br /> - r ~ « ~ ~ }'"n~~~ _ "~~~ahu?as t+wN_#Il~~t~eot _:ao? <br /> ',;fn's `,~.'k ;;F: <br /> Ka•_ <br /> ~i,~.~a,~v 'y',~'.~.:1', ate: r \ <br /> Date: Date: <br /> O 1PROJECTS\PRO]-6\4326\Design\Budget\4326-20070522 SDCAllocatan.xls Revised Marc, 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.