Run Date: 09/10/2007 16:36:48 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Pa}zent No 002 <br /> Contractor: OREGON WOODS <br /> Job N: 93-004326 Original Contract: $220,172.84 <br /> Contract No: 2007-00019 CLrrent Amount: $220,172.34 <br /> PO k: 2007100367 Contract Award Date: OS/DBJ2007 <br /> Assessable: No Completion Date: 12/31/2007 <br /> Line Description Last Chna Ord Current Contract Hatimated Payment Cumulative Totals <br /> Unit Price Unit Measure Quantity Amount Quantity pmt 4 Complete <br /> Amount <br /> AlUIZON CRK ODTFALL STABILIZATION, BAILEY RILL/POLR <br /> General <br /> 0000 Liquidated Damages ($220.00) DAY <br /> D.aoa $D.DO o.DDO , <br /> So.oo o.DDD So.DD <br /> DO10 MOBILIZATION 0.00 <br /> $35,000.00 LUMPSUM 1.000 $35,000.00 0.370 $12,950.00 1.000 ~ <br /> 0020 TEMP. NORK ZONE TRAPPIC CONTRO $35,000.00 N 100.00 <br /> $7, 000.OD LUMPSUM 1.000 $7,000.00 0.470 <br /> $3,290.00 0.800 ~ 30.00 <br /> 0030 EROSION CONTROL $5,600.00 <br /> $4,OD0.00 LUMPSUM 1.000 $4,000.00 0.470 <br /> $1,BBD.DO 0.300 - $3,200.00 80.00 <br /> 0040 CONSTRUCTION HNTRANCES $1, OD0.00 EACH <br /> 2.000 $2,000.00 0.000 $0.00 0.000 <br /> 0050 COMPOST FILTER BERM $0.00 0.00 i <br /> $10.00 POOT 200.000 $2,000.00 0.000 <br /> So.oD o.ooo ' $o.oD D.oD ~ <br /> 0060 DEWATERING, COMPLETE $25,000.00 LUMpSUM <br /> 1.000 $25,000.00 0.670 $16,750.00 1.000 _ <br /> 0070 REMOVAL OF CONCRETE SLAB $25,000.00 M 100.00 ~ <br /> $5.00 SQFT 590.000 $2,700.00 540.000 $2,700.00 590.000 ~ <br /> 0030 CLEARING AND GRUBBING $2,700.00 100.00 <br /> $3,000.OD LUMPSUM 1.000 $3,000.00 0.670 $2,010.00 1.000 <br /> 0090 GBf4E1NL BXCAVATION $3,000.00 100.00 <br /> $25.00 COYD 11.400 5285.00 25.000 <br /> $625.00 50.000 ~ $1,250.00 439.00 <br /> 0100 BANR STABILIZATION EXCAVATION $25.00 CUYD <br /> 650.000 $16,250.00 405.000 $10,125.00 405.000 <br /> 0110 BANK STABILIZATION BACRFILL $10,125.00 62.00 <br /> $50.00 CUYD 575.000 $28,750.00 336.000 $16,800.00 336.OOD <br /> 0120 BRISTLE COIR WOVEN BLANKET REI $16,800.00 M 58.00 <br /> $6.50 SQYO 2,350.000 $15,275.00 2,900.000 $15,600.00 2,400.000- <br /> 0130 LOOSE STONE, CLASS A $15,600.00 102.00 <br /> $20.00 TON 570.000 $11,400.00 184.730 $3,695.60 938.890 i <br /> 0190 L003E 3TONE, CLASS B $3,777.80 77.00 ' <br /> 525.00 TON 122.000 $3,050.00 146.040 $3,651.00 234.320 i <br /> 0150 LOOSE STONE, VANE FOOTER STONE $5,353.00 192.00 <br /> $25.00 TON 5.600 $190.00 O.ODD <br /> $0.00 s.6oa~ $lao.oD loD.Do <br /> 0160 LOOSE STONE, VANE STONE $25.00 TON <br /> 6.100 $152.50 0.000 $0.00 6.100 <br /> 0170 L90SH STONE, VANE KEY STONE $152.50 100.00 <br /> $300.00 TON 0.200 $60.00 0.000 <br /> $0.00 0.200 ~ $60.00 100.00 <br /> 0130 PLACE LOOSE STONE - PORCE ACCO $40,000.00 LUMPSUM <br /> 1.000 $4D, OD0.00 0.343 $13,700.00 0.693 <br /> 0190 CDT &7! PIPE TO BEVEL END (10-4 $25,700.00 M 64.00 <br /> $250.00 EACH 5.000 $1,250.00 1.000 $250.00 4,OOp~ <br /> 0200 SALVAGING AND RELAYING 29" PIP $1,000,00 80.00 <br /> $50.00 FOOT 90.000 $2,000.00 12.000 <br /> $600.OD 12.0001 $600.00 30.00 <br /> <br /> 0210 SALVAGING AND RELAYING 30" PIP $50.00 FOOT <br /> 35.000 $1,750.00 19.OOD $700.00 14.000 / <br /> $700.00 aD.oo <br /> <br />